![background image](http://html1.mh-extra.com/html/zodiac/15900-013/15900-013_component-maintenance-manual-with-illustrated-parts-list_3993230052.webp)
MONOGRAM SYSTEMS
COMPONENT MAINTENANCE MANUAL with ILLUSTRATED PARTS LIST
BASIC PN 15900
Page 704
Monogram Proprietary – See title page for details
38-31-09
May
17/02
(3) Storage
Instructions
When the toilet assembly is to be stored after overhaul, all openings shall be
sealed and, if possible, replaced into the original shipping container. If a
shipping container is not available, a wooden framework may be built
around the toilet assembly; the whole structure should be covered and
sealed with plastic sheeting. Toilet assembly shall not be stored exposed to
the sunlight or at temperatures below 0°F (-17,78°C) or over 170°F
(+76,67°C) for prolonged periods. Stored toilet assembly shall be clearly
marked with part number and date of overhaul.