25-30-31
Nov. 16, 2012
CMM & IPL
1010099 SERIES
Page 7003
ASSEMBLY
(3)
Fit the power switch (4/60) and indicator lamps (4/80,4/100) to the front sheet assy
(100).
(4)
Fit the wiring to the power switch (4/60) and indicator lamps (4/80,4/100) according to
Fig. 102.
(5)
Fit the front sheet assy (100) with a nut (540) to the kettle assy and with screws (40) to
the frame assy boiler (10). Use the washer lock teeth (380) and nut (370) to support the
front sheet assy (100) when the drain valve (350) is connected to the front sheet assy
(100). When not enough space is available the nut may be omitted.
(6)
Install the handle positioner (360) and fasten it with a nut (370). Observe the position of
the handle positioner so the drain valve operates as intended.
(7)
Fit the front panel (130) with screws (40) to the frame assy boiler.
(8)
Unit L13471 excluded
Fit the top sheet (580) with screws (590) to the frame assy boiler.
(9)
For unit L13471-19, L13471-33 & L13471-40 only
Fit the back sheet (600) to the frame assy boiler (10) using screws (40).
Summary of Contents for L13471
Page 2: ......