18 

5.6.1

 

Example wiring diagram of single battery system into a cabinet 

 

Figure 10 Cabinet wiring diagram. 

Steps: 

1)

 

First, insert the positive plug of the Positive Battery Cable into the corresponding socket on the 
Battery  Module,  then  connect  the  other  end  to  the  battery  side  of  the  D.C.  isolating  switch  a. 
Connect the negative plug of the Negative Battery Cable into the negative socket on the Battery 
and then connect the other end to the D.C. isolating switch b. 

2)

 

Take out the communication cable, install it as shown in Figure 10, connect it to the communication 
port  on  the  right  side  of  the  cabinet,  and  then  use  RJ45  to  connect  it  to  the  PCS  (inverter) 
communication port. 

3)

 

Use the M6 x 6mm pan head screw to fix one end of the ground wire of the pressed terminal at the 
grounding screw, and the other end is connected to the grounding copper bar such as figure 11. 

4)

 

The ground wire of PCS or combiner box, etc. is connected to the external grounding copper bar. 

Note 

 

Before wiring, the switch on the cabinet shall be in the off state.   

 

Before the positive wire and negative wire are connected to the system, any exposed conductor 

part needs to be wrapped with insulating tape to prevent short circuit. 

 

The D.C. Isolating switch and external copper bar are not shipped with the battery system. If 

necessary, contact ZNTECH or an Authorized Reseller in the Territory 

 

This  unit  is  not  suitable  for  outdoor  installation.    An  Outdoor  Cabinet  is  not  offered  by 

Summary of Contents for LBB051100A

Page 1: ...Name Residential Energy Storage Box User Manual Product Model LBB051100A Date 04 11 2019 Add NO 245 BINKANG RD CHANGHE ST BINJIANG DISTRICT HANGZHOU ZHEJIANG NO 799 YAOCHENG AVENUE CMC TAIZHOU JIANGSU...

Page 2: ...Installation 11 5 1 Items in the Box 11 5 2 Installation Precautions 12 5 3 Clearance 13 5 4 Tools and Safety Gear 13 5 5 Installation Steps 14 5 6 Wiring 16 5 7 Use of D C isolating Switch 19 6 Inst...

Page 3: ...Residential Energy Storage Box User Manual REV NO V1 2 Date November 4 2019 ZHONGNENG TECHNOLOGY HANGZHOU CO LTD 2 1 Safety Rules 1 1 Symbol and Terms 1 Product Label 2 Warning label Explanation of t...

Page 4: ...n minor injuries or minor or moderate damage to the equipment and property Do not short the battery Do not disconnect or disassemble by non professionals Don not use water to extinguish fire Do not pl...

Page 5: ...before operating the battery 6 When climbing during maintenance pay attention to safety to prevent people from falling or batteries from falling 7 When connecting high voltage power cords use insulat...

Page 6: ...nnect the power by following the shutdown procedure and contact the supplier for repair 20 During installation of the battery the utility grid and solar input must be disconnected from the Battery sys...

Page 7: ...em is on fire do not try to extinguish but evacuate people immediately 1 3 3 Wet Batteries If the battery system is wet or immersed in water please do not approach it and contact ZHONGNENG Technology...

Page 8: ...o modules in series to form a 1P16S LBB051100A system Lithium ion batteries include positive and negative plates separators electrolytes battery containers and safety valves Note The following single...

Page 9: ...MANUAL NAME LBB051100A Residential Energy Storage Box User Manual REV NO V1 2 Date November 4 2019 ZHONGNENG TECHNOLOGY HANGZHOU CO LTD 8 Figure 2 Outline of the battery system...

Page 10: ...Current 50Ad c Standard Discharge Current 50Ad c Maximum Discharge Continuous Current 70Ad c Maximum Discharge Pulse Current 100Ad c 30s 25 2 SOC 40 Operation Temperature Range 0 55 charge 20 55 disch...

Page 11: ...cation Socket RCP 5SPFFH TCU7001 Amphenol rj45 CAN 3 Communication Socket RCP 5SPFFH TCU7001 Amphenol rj45 CAN 485 4 Positive Socket C10 730187 010 Amphenol red 25mm2 5 Positive Socket C10 730187 010...

Page 12: ...stem has been tested and checked strictly but it still may be damaged during transporting so please check it carefully Inspect the battery s appearance if any shipping damage is found report it to the...

Page 13: ...e in the battery installation instructions and you must firmly fix the wiring It is strictly forbidden to short circuit the positive and negative terminals of the battery and touch the two terminals o...

Page 14: ...ear The following tools are required to install the battery system Wire cutter Crimping Modular Plier Screw Driver Note Use properly insulated tools to prevent accidental electric shock or short circu...

Page 15: ...mage to the product 5 5 Installation Steps 5 5 1 Cabinet fixing example Figure 5 Cabinet fixed installation example Steps As shown in Figure 1 above use 4 M6 50 expansion screws to fix the mounting pl...

Page 16: ...d to provide them please contact ZNTECH or an Authorized Reseller in the Territory 5 5 2 Installing Angle Bracket Figure 6 Lock the left and right corner Steps As shown in Figure 6 place the battery s...

Page 17: ...ple of installation diagram of single battery system into a cabinet Steps As shown in Figure 7 put the battery system into the cabinet and fix it with six M6 x 12mm external hexagon combination screws...

Page 18: ...wiring reference diagram of the battery system is as follows Figure 9 Installation diagram of single battery system Warning The cross sectional area of the Earth conductor shall not be less than 6 mm...

Page 19: ...nication port on the right side of the cabinet and then use RJ45 to connect it to the PCS inverter communication port 3 Use the M6 x 6mm pan head screw to fix one end of the ground wire of the pressed...

Page 20: ...ating switch is Nader DC80V 63A DC D C isolating switch The reference figure is as follows Figure11 Schematic diagram of D C isolating switch The system current changes after different Numbers of pack...

Page 21: ...normal During normal operation the green light is always on 9 The power system needs to check the insulation resistance before each use to prevent battery leakage 10 When the power system is shipped f...

Page 22: ...prior to the alarm System protection The red light blinks for 0 5 seconds every 2 seconds The green light continues to operate in the same manner as immediately prior to the alarm Other alarm Table 5...

Page 23: ...tory Note Pay attention to electrical protection for unplugged communications and cables use temporary terminal blocks or insulating tape to insulate all wire ends as they are disconnected Ensure wire...

Page 24: ...aging for damage at the time of receipt Check that the goods are complete and check according to the order on the packing list After unpacking check that the internal parts are intact If you find any...

Page 25: ...erms specified in this manual have been added deleted or modified from the original without the consent of the manufacturer or supplier then the manufacturer supplier shall not bear any related liabil...

Page 26: ...accordance with the Product Manual and 5 Be used on a daily cycle basis and only for energy storage system 6 Falls within the Warranted Period Any Product failure fault or warning information must be...

Reviews: