MANUAL NAME: LBB051100A Residential Energy Storage Box User Manual
REV NO.
.: V1.2
Date: November 4, 2019
ZHONGNENG TECHNOLOGY (HANGZHOU) CO., LTD
20
positive and negative electrodes of the power system at the same time with your hand or other
metal objects to avoid electric shock or short circuit.
3)
The power supply system should be securely fixed, and the power supply system should be
prevented from working in the reverse state.
4)
The system product layout must take into account that the power system is easy to remove and
easy to wire.
5)
The positive and negative output terminals of the power system are marked with positive and
negative, respectively, and should be distinguished when connecting.
6)
The location of the high-voltage A.C. power cord should be safe and appropriately
insulated/protected, and the connection should be reliably secure.
7)
The connector is securely in place and the wiring should be safe.
8)
After the installation is correct, press the on/off button switch on the Battery. After a few seconds,
it should flash green, indicating that the system is normal. During normal operation, the green
light is always on.
9)
The power system needs to check the insulation resistance before each use to prevent battery
leakage.
10)
When the power system is shipped from the factory, its State of Charge (SOC) is 40%.
Note:
Do not dispose of the batteries in the battery system yourself during maintenance.
All products must be subjected to "routine inspections" before first use and before
reassembling the power system for the first time.
When performing maintenance operations on the battery system and power management
system, in order to ensure safely disconnect all power to the System. If the System must be
powered in order to perform maintenance or testing operations, it must be operated in
accordance with relevant insulation requirements to avoid electric shock.
If you have any questions, please contact the supplier directly.
6.2
Power on the System
Note:
Make sure that the cables connected to the power system are properly routed, protected and
secured, and that there are no foreign objects around the machine before turning on the battery system/system.
Start-up steps:
Click the power system switch button.
The button indicator lights for 2 seconds, and then the green light flashes every 2 seconds,
indicating that the power is on.