Modules must be securely attached to the mounting structure using pre-drilled mounting holes in the frame.   

 

Modules should be bolted to support structures through mounting holes located in the frame's back flanges 
only. Do not drill additional holes. Doing so will void the warranty.   

 

Use  appropriate  corrosion-proof  fastening  materials.  All  mounting  hardware  (bolt/split  washer/flat 
washer/nut) should be stainless steel M8 size. 

 

Follow  mounting  guidelines  recommended  by  the  PV  mounting  supplier.  The  mounting  design  must  be 
certified by a registered professional engineer.   

 

The mounting design and procedures shall comply with local codes and all authorities having jurisdiction. 

 

Use a torque wrench for installation. Tightening torques should be within 10~17 Nm for M8 coarse thread 
bolts, depending on bolt quality class. 

 

Ensure that the drainage openings of the frame are left open following installation to allow water runoff.   

This prevents frost damage. 

 

Install the module in such a way that rainwater and snow melt can run off freely to avoid standing water or 
pudding. 

 

This resistance value can decrease if modules are not mounted following the instructions above. 

 
 

(B) Clamping installation (Only for frame with 40mm thickness) 

Modules can be installed with clamps. Modules must be securely attached to the mounting structure with four 
clamps on the long frame. 

 

The  modules  must  be  properly  secured  to  their  support  so  that  they  can  withstand  live  load  condition, 
including wind uplift, to the pressure they have been certified for. It’s the installer’s responsibility to ensure 
the clamps used to secure the modules are strong enough. 

 

The modules are not subject to wind or snow loads exceeding the maximum permissible loads. 

 

The module clamps which are used must not come into contact with the front glass and must not deform the 
frame. Avoid shadowing effects from the module clamps. Drain holes in the module frame must not be closed 
or obscured by the clamps. 

 

The module installed with clamps on the front  frame for load (see the following picture), and refer to the 
following table. 

 

Mechanical load 

pressure 

 

Clamps 
Width 

Installation direction 

+2400Pa/-2400Pa 

(with safety factor 

1.5) 

 

60mm 

 

 
 
 
 
 
 

 
L:

Long edge distance for frame

 

 
 
 
 

L

the length for long frame

 

Summary of Contents for ZXM6-H144

Page 1: ...ration and maintenance of your photovoltaic system is only carried out by qualified persons able to carry out the technical procedures described in this manual i e system planers installers and mainte...

Page 2: ...H120 ZXP6 H120 Max series fuse rating A 15 Nominal Mass 22 5kg 21 5kg 21kg 20 5kg 20 5kg 19 5kg Package Size mm 2000x992x40 35 2024x1002x40 35 2020x1002x40 35 2040x1002x40 35 1844x992x40 35 1860x1002...

Page 3: ...ces If there is exposure to salt i e marine environment and sulfur i e sulfur sources volcanoes there is a risk of corrosion It s not recommended to install the modules when the distance is less than...

Page 4: ...ns where the solar modules are mounted to a permanent structure the solar modules should be tilted for optimum winter performance As a rule if the system power output is adequate in the winter it will...

Page 5: ...he bolt and the bolt must be put through the hole fixed in the aluminum frame 3 Use the nut and cut washer to fix all the parts The copper wire can not be attached to the aluminum Do not interrupt or...

Page 6: ...secure the modules to support structure Always use all the eight mounting holes to secure the modules The module installed with screws on the front frame for load see the following picture and refer...

Page 7: ...can run off freely to avoid standing water or pudding This resistance value can decrease if modules are not mounted following the instructions above B Clamping installation Only for frame with 40mm t...

Page 8: ...just for reference Customer can select the corresponding installation manual based on the purchased module 7 Wiring The modules use thePV JX1203 type junction box This box on the back side of the modu...

Page 9: ...oose the control box with LJQ 1 LJQ 3 type Connectors 8 Maintenance and cleaning Do not change the PV components optionally diode junction box plug connectors Given a sufficient tilt at least 15 it is...

Page 10: ...iring and the inverter Be sure carefully to follow manufacture s installation instructions Artificially concentrated sunlight shall not be directed on the modules or panels 11 Danger of death from arc...

Page 11: ...anels coated glass 9 as mono panels doped with gallium coated glass 11 12 9 10 6 7 8 5 3 4 1 2 PV modules were manufactured by ZNshine ZNSHINE PV TECH Co Ltd No 1 South Zhenxing Road Industrial Zone Z...

Page 12: ...Power Pm W 390 395 400 405 Max Power Voltage Vmp V 40 6 40 8 41 41 2 Max Power Current Imp A 9 61 9 69 9 76 9 84 Open Circuit Voltage Voc V 48 7 48 9 49 1 49 3 Short Circuit Current Isc A 10 08 10 16...

Page 13: ...s Fuse A 15 Electrical Performance STC Model Type ZXM6 H120 315 M ZXM6 H120 330 M Max Power Pm W 315 330 Max Power Voltage Vmp V 33 2 33 8 Max Power Current Imp A 9 49 9 77 Open Circuit Voltage Voc V...

Page 14: ...dule mm kg Dimensions mm Weight kg 1675x992x40 35 VDC Max System Voltage VDC 1500 A Max Series Fuse A 15 Electrical Performance STC Model Type ZXP6 H120 300 P Max Power Pm W 300 Max Power Voltage Vmp...

Reviews: