37
Pr
eparing
th
e
Refriger
ator
Enclosur
e
Preparing the Water Hose and the Power Plug
You will need a hose with a minimum length of 60" (1.5 meters) and a diameter of ¼"
for water connections of the product during installation.
A connector that has a thread with an external diameter of ¼ must be used to connect
the hose end to the product.
You can choose the method A or method B below to prevent the cable from getting
jammed.
• Method A: Locate the water hose and power supply on the back
• Method A: Locate the water hose and power supply on the back
INSTALLATION
Summary of Contents for RBIV-30
Page 1: ...Built in Refrigerators Installation Guide and Users Manual...
Page 15: ...10 Preparing the Refrigerator Enclosure INSTALLATION Dual cabin placement methods...
Page 21: ...16 Preparing the Refrigerator Enclosure RBIV 36 INSTALLATION...
Page 25: ...20 Preparing the Refrigerator Enclosure INSTALLATION RBIV 36...
Page 26: ...21 Preparing the Refrigerator Enclosure INSTALLATION RBIV 36...
Page 27: ...22 Preparing the Refrigerator Enclosure INSTALLATION...
Page 28: ...23 Preparing the Refrigerator Enclosure INSTALLATION RBIV 36 RBIV 30...
Page 58: ...53 Preparing the Refrigerator Enclosure INSTALLATION RBIV 36...
Page 60: ...55 Preparing the Refrigerator Enclosure PREPARING THE FREEZER DOOR PANEL INSTALLATION RBIV 30...
Page 73: ...68 Preparing the Refrigerator Enclosure Attach the side closing seals 2 3 WARNING INSTALLATION...
Page 114: ......