TS2000 Pro Series Tripod Turnstile
User Manual
P a g e
| 7
Copyright©2021 ZKTECO CO., LTD. All rights reserved.
2
Arm Installation and Equipment Testing
Arm Installation Method
2.1
In order to keep the arm won’t be damaged during the transportation. The arm wasn’t install on device.
Installation procedure
Put arm kit into the hole of cabinet, make sure the screw holes match with mechanism core, then tighten 3
hex screws, as shown in Figure 2-1.
Figure 2-1
Power-on Test before the Installation of Device
2.2
1. Please make sure that the power requirements are strictly met to avoid permanent damage to the
unit. Input voltage: AC 100~120V /200~240V.
Note:
The tripod turnstile must be connected to the ground (earth).
2. Power on and wait 30s for the tripod turnstile to finish the self-check program.
3. Lift the arms manually, as shown in Figure 2-2.
4. Check whether the tripod turnstile and the LED indicators work properly.
If there is any problem, please contact the supplier.