background image

 
 
 
 
 

Swing Barrier Turnstile Installation Guide 

Applicable Models: SBT1000S 

Version: 1.2   Date: May. 2018

 

 

 

Summary of Contents for SBT1000S

Page 1: ...1 Swing Barrier Turnstile Installation Guide Applicable Models SBT1000S Version 1 2 Date May 2018 ...

Page 2: ...is necessary to check the device first 1 Connect the wires to power supply 2 Open the air switch to test whether the device is working properly wait for 10 seconds for the gate to complete self test program If everything is normal you can start the installation procedures If an exception occurs please contact your vendor for information 2 2 Cables installation For the outlets of the concealed cabl...

Page 3: ... expansion bolts M12 into the positioning holes 5 Remove the access cover as shown in Figure 2 4A 6 Put pads and use a wrench to tighten nuts as shown in Figure 2 4B 7 Close the access cover as shown in Figure2 4C 8 Install the barrier arm glass baffle or U shaped stainless steel pipes as shown in Figure2 4D 1 Figure 2 3A 2 Figure 2 3B Screw pad Chassis Ground Expansion bolt 4 M12 Ground Base conc...

Page 4: ...NC COM NO GND 12V 5V GND A B Z 12V LEDG LEDR LEDY GND ZUO YOU GND 12V EC_L1 GND EC_H1 IN SW IN SW IN SW EC L EC H 24VOUT GND BAT GND 24VIN EGND GND VCC GND VCC GND VCC GND VCC GND VCC GND VCC GND VCC GND VCC GND Encoder Electromagnetic clutch VCC GND VCC GND VCC GND VCC GND VCC GND VCC GND VCC GND VCC GND AP R IR3 IR3 on the top SPK COM NO COM NO 12VOUT GND 24V Power Firefighting port SBT1000S ser...

Page 5: ...ance may be too large Increase the value of minimum compensation speed 2 No sound 1 Check if the speaker wire is loose 2 Check if voice is turned off 3 Swing arm is not centered Enter the menu of Swing arm zero correction to adjust the zero position 4 The control panel LCD shows Encoder wiring error Please check if the wiring of encoder A B phase is reversed If yes replace it 5 The direction of ga...

Reviews: