CHAPTER 4
INSTALLATION / FIRST START-UP
TRANSPORT AND UNPACKING
- Check if the supply corresponds to the delivery note.
- Check the delivery for completeness and integrity immediately after receipt. Evident defects must
be noted on the delivery notes, in order to claim for compensation against the carrier company.
- In case of complaints, have the transport documents countersigned by the carrier and send a
copy to Zirkonzahn.
- Follow the safety regulations for moving loads.
- A forklift or a lift tray truck (> 300 kg) are recommended for the transport of the pallet
(observe pictograms on packing).
- Transport weights:
Zirkonofen 700 or
91 kg
Zirkonofen 700 Ultra-Vakuum
117 kg
Pallet
20 kg
- The sintering furnace is supplied on a pallet and encased by a cardboard box.
- Do not put any other object on top of the cardboard box.
- Caution when removing the cardboard box (glass lining).
CAUTION:
Remove the packaging material in the combustion chamber.
- Caution when unpacking and setting up the system: risk of injury.
INSTALLATION /
FIRST START-UP
Summary of Contents for ZIRKONOFEN 700
Page 1: ...Zirkonofen 7oo 7oo Ultra vakuum operator s and maintenance manual ...
Page 3: ...03 03 ...
Page 7: ...07 07 ...
Page 10: ...10 10 ...
Page 18: ...18 18 CHAPTERL SAFETY RESIDUAL RISKS ...
Page 19: ...19 19 CHAPTER 2 COMPONENTS COMPONENTS ...
Page 28: ...28 28 CHAPTERL 5 OPERATION ...
Page 30: ...30 30 CHAPTERL 6 SINTERING PROGRAMMES ...
Page 33: ...33 33 CHAPTER 7 CLEANING AND MAINTENANCE ...
Page 34: ...34 34 CHAPTERL 7 CLEANING AND MAINTENANCE ...
Page 43: ...43 43 ...