background image

WWW.

ZIPPITY

-OUTDOOR.COM

9

ASSEMBLY 

INSTRUCTIONS

ZP19071

STEP 5.2

1.

 Place (1) Latch 

(J)

 against the gate top rail and drill four holes through the pre drilled holes 

in the latch body.

2.

 

Drive (4) total 1/2” black self-tapping stainless steel screws through the holes in the latch 

body.

J

STEP 6: 

INSTALL

 GATE WINGS INTO THE GROUND

STEP 6.1

 

Move the gate wings to their final location and mark the location of the wing posts. The 

wing posts should be 36 ¾” apart from rail end cap to rail end cap or 39 ¼” from outside of 

wing post to outside of wing post.

36 3/4”

39 1/4”

Note:

  It is recommended to use two people for in-ground installation.

Summary of Contents for BURBANK ZP19071

Page 1: ...MBLY INSTRUCTIONS ZP19071 WWW ZIPPITY OUTDOOR COM VER 032422 ZP19071 ASSEMBLY INSTRUCTIONS 60 MIN Approximate assembly time Want to see a video on how to assemble this product Scan the QR code BURBANK...

Page 2: ...service department parts nychbrands com support zippity outdoor com 704 892 5222 877 234 6196 Customer service agents are available to take calls weekdays from 9am 5pm EST If you call outside of busin...

Page 3: ...WWW ZIPPITY OUTDOOR COM 3 ASSEMBLY INSTRUCTIONS ZP19071 12 0 in 41 1 in 34 1 in 39 6 in 59 7 in 36 7 in 2 4 in 1 1 in...

Page 4: ...WWW ZIPPITY OUTDOOR COM 4 ASSEMBLY INSTRUCTIONS ZP19071 STEP 1 LAY OUT MATERIALS Check the inside of the larger pieces in your box for other materials packed inside STEP 1 1...

Page 5: ...Hinge Assembly 2 1 2 Black Self Tapping Stainless Steel Screw 14 3 4 White Self Tapping Stainless Steel Screw 28 Rail End Cap 12 10 pre installed 2 loose Gate Bottom Rail 1 1 x 1 x 36 D C Post Anchor...

Page 6: ...e wing top rail STEP 3 ASSEMBLE THE GATE WINGS STEP 3 1 M A 1 2 Align G STEP 3 2 1 Slide the Wing Bottom Rail F up the wing posts until the pre drilled holes in the bottom of the wing posts and the ra...

Page 7: ...1 1 Slide 1 Gate Top Rail E over the bottom of the Gate Posts B until the pre drilled holes in the gate top rail and top of gate posts align Slide 1 Gate Bottom Rail D over the bottom of the gate post...

Page 8: ...e through the pre drilled holes in the hinges 2 Drive 4 total 1 2 Black Self Tapping Stainless Steel Screws L through the holes in the hinges 1 Insert 8 Pickets C into the gate rails until the tabs lo...

Page 9: ...tapping stainless steel screws through the holes in the latch body J STEP 6 INSTALL GATE WINGS INTO THE GROUND STEP 6 1 Move the gate wings to their final location and mark the location of the wing po...

Page 10: ...und is too hard follow these steps illustrated below 1 Loosen the top 6 to 8 of the ground using a claw hammer or similar tool 2 Add water to soften the soil 3 Use a block of wood to protect the top o...

Page 11: ...r ground is too hard please consider these options 1 Use a 1 diameter auger bit commonly used for planting tulips as illustrated 15 20 on Amazon com 2 Drill a hole about 12 to 16 deep at the desired l...

Page 12: ...IONS ZP19071 STEP 6 4 Level the assembled unit Backfill and compact dirt around the base of each wing post to strengthen the unit STEP 6 5 Push the post caps down over the tops of the wing posts as il...

Page 13: ...re drill two holes for each hinge with the 1 16 drill bit and fasten both hinges with 4 1 2 black self drilling stainless steel screws Align the latch catch with the latch body and pre drill two holes...

Page 14: ...S Drive the 3 4 white self tapping stainless steel screws and the joiner clips included with your Burbank Fence Kit ZP19057 to connect the gate wings to the fence panels as shown below STEP 8 1 Note I...

Page 15: ...WWW ZIPPITY OUTDOOR COM 15 ASSEMBLY INSTRUCTIONS ZP19071 WWW ZIPPITY OUTDOOR COM 704 892 5222 877 234 6196 support zippity outdoor com 6935 Reames Rd Ste K Charlotte NC 28216...

Reviews: