WWW.
ZIPPITY
-OUTDOOR.COM
9
ASSEMBLY
INSTRUCTIONS
ZP19071
STEP 5.2
1.
Place (1) Latch
(J)
against the gate top rail and drill four holes through the pre drilled holes
in the latch body.
2.
Drive (4) total 1/2” black self-tapping stainless steel screws through the holes in the latch
body.
J
STEP 6:
INSTALL
GATE WINGS INTO THE GROUND
STEP 6.1
Move the gate wings to their final location and mark the location of the wing posts. The
wing posts should be 36 ¾” apart from rail end cap to rail end cap or 39 ¼” from outside of
wing post to outside of wing post.
36 3/4”
39 1/4”
Note:
It is recommended to use two people for in-ground installation.