ZI-HS8
SPECIFICATIONS
2
Please see for reference Picture strip
A
. At least 2
people are required to unpack the log splitter pa
-
ckage. Take the following steps to put the Log Split-
ter on the ground by tipping every side of the carton
by 45 degree. Make sure put Block (B) to support
the Log Splitter package (A) at the point a little
This log splitter is designed for operating under am-
bient temperatures b5
o
C and 40
o
C and for
installation at altitudes no more than 1000m above
M.S.L.
The surrounding humidity should be less than 50%
at 40
o
C.
It can be stored or transported under ambient tem-
peratures between -25
o
C and 55
o
C.
Motor
Log diameter range
Max. log length
Maximum Force
Hydraulic Pressure
Ram Travel
Forward Speed
Retract Speed
Noise Level
Length
Width
height
Weight
TECHNICAL DATA
400V/50Hz 3500W IP54
12 cm ~ 32 cm
104 cm / 78 cm / 52 cm
8 t
20.4 Mpa
480 mm
5.4 cm/sec
11.7 cm/sec
80.1 dbA no load / 92.5 dbA full load
83 cm
93 cm
147 cm
115 kg
ELECTRIC REqUIREMENTS
3
With 3 phase 400 Volt / 50Hz motor, the log splitter
should be connected to standard 400V+10%
/ 50Hz+1Hz. Electrical supply which has protec-
tion devices of under-voltage, over-voltage, over-
current as well as a residual current device (RCD)
which maximum residual current rated at 0.03A.
The mains connection and extension cable must
have 5 wires = 3P + N + PE (3/N/PE).
The mains connection must have maximum 16 A
fuse. Electrical connection rubber cables must com-
ply with EN60245 which are always marked with
symbol H 07 RN. Cables should be identified, as it
is a legal requirement.
UNPACKING
4
higher than the middle. The other side of Block (B)
shall be against steady object, such as a wall.
Wedge (C) shall be arranged under the tipped Log
Splitter Package (A) every step to avoid slipping.
Then remove the carton off the Log Splitter.
DELIVERY CONTENT
5
For reference, check picture
B
A
Log Splitter
1
B
Control Lever and Guard Assy
2 sets
C
Log splitting table
1
D
Manual
1
SET UP AND PREPARATION FOR OPERATION
6
CONTROL LEVER AND GUARD ASSEMBLY
For Reference see picture
D
Pull Spring Pin (A) to remove the Lock Pin (B). Apply
a thin coat of grease to both surfaces of the Con-
trol Lever Guard as illustrated. Insert the Control
Lever and Guard Assy and make sure the Control
Lever End goes into the slot of Connection Bracket
(C). Lock the Control Lever and Guard Assy down
with the Lock Pin (B) and Spring Pin (A). Follow the
same steps to install the other Control Lever and
Guard Assy on the other side. Grease the Splitting
ram as well!
SUPPORT TABLE
4.
For Reference see picture
E
3 installation positions available for the Support Ta-
ble for different splitting length. At every installa-
tion positions, lock-down hooks (D) are available.
Insert the Support Table in the selected Brackets
(E). Turn the Lock Down Hooks (D) on both side by
90 degrees to lock the Support Table down.
EN
Summary of Contents for ZI-HS8
Page 2: ......
Page 4: ...ZI HS8 A B C D...
Page 5: ...ZI HS8 I F G H J E...
Page 6: ...ZI HS8 M L K...
Page 7: ...ZI HS8...
Page 15: ...ZI HS8...
Page 23: ...ZI HS8...
Page 24: ...ZI HS8...
Page 25: ...ZI HS8...
Page 27: ...ZI HS8...
Page 28: ......