Zip Tudor II P4/52 Installation, Maintenance And User Instructions Download Page 8

 Instructions. V1.01 

Page 7  

JUNE / 2013

Installation.

Requirements

.

• 

Before  starting  installation  the 

WARNINGS 

 

 (page 3) and 

CAUTIONS 

 (page 4) 

should be read and fully understood.

• 

It  is  recommended  that  the  piping  and  water  connection  is  carried  out  by  a  qualified 

plumber.

• 

Thoroughly flush the water supply pipes before installation to remove any water borne 

debris.

•  The electrical installation including earthing and cross bonding should comply with current 

IEE regulations and any Local Authority requirements.

• 

Zip Contract and Tudor water heaters must be installed according to the specification on 
the rating plate and the technical specifications.

•  Take care to protect the wiring from damage during installation and ensure that any 

uninsulated wiring is not directly accessible after installation.

•  For maintenance work an isolating valve should be installed in the water supply line to 

the heater.

•   A minimum clearance of 270mm is required underneath the overbasin heater units and 

above the underbasin units to allow for the removal of the element plate assembly and for 
servicing purposes.

•  When considering the location of the heater, consideration should be given to the safe and 

visible disposal of any water resulting from leaks and seepage. 

Wall Mounting.

The unit will be supported by being hung on a bracket fixed to a support wall, using the 
fixings provided (as shown fig.1). 

Therefore it is important to ensure that the wall is strong and solid enough to fully support 
the unit when full.
It is important to ensure when drilling the wall, that the selected position avoids any 
pipework or electrical cabling.
To mount the heater, the bracket ‘hooks’ locate into the slots provided in the back of the 

unit, allowing it to hang flat against the wall.

    IT IS NOT NECESSARY TO REMOVE THE CASING TO MOUNT THE 

                      WATER HEATER ON THE WALL BRACKET.

 

fig. 1

Summary of Contents for Tudor II P4/52

Page 1: ...Please read these instructions carefully before commencing installation of the water heater Please leave these instructions with the end user after installation Zip Heaters UK Ltd 14 Bertie Ward Way...

Page 2: ...re commencing installation of the Point of Use Water Heater Please leave these instructions with the end user after installation To ensure you have a copy of the latest instructions visit www zipheate...

Page 3: ...ater that occurs during the heating cycle to be safely discharged During the heating cycle drips will form and fall from the delivery spout or tap and these will cease when the cycle has been complete...

Page 4: ...ce its wiring and piping must not be modified in any way In case of malfunction isolate the power supply immediately In case of leaks also isolate the water supply Repairs must only be carried out by...

Page 5: ...NO CIRCUMSTANCES SHOULD THE SPOUT OR OUTLET BE CONNECTED TO A TAP WHICH IS CAPABLE OF BEING CLOSED The Zip Tudor II and Contract II is intended for connection to mains supply only In any other case p...

Page 6: ...310x265 Minimum weight kg Empty 3 5 4 0 Maximum weight kg Full 8 5 14 0 Rated volume litres 5 10 Water connections BSP 1 2 Protection class IP24 All data quoted at nominal supply voltage For higher su...

Page 7: ...settable cut out CT0122 X 5a Thermal fuse CT0120 X 6 Neon light indicator CT0129 4 X X 7 Retaining nut CT0115 4 X X X 8 Front cover 5L CT0103 3 X 8 Front cover OB 5L CT0123 X 8 Front cover UB 5L CT012...

Page 8: ...solating valve should be installed in the water supply line to the heater A minimum clearance of 270mm is required underneath the overbasin heater units and above the underbasin units to allow for the...

Page 9: ...d Supply In Hot to Tap ZIP Approved Vented Tap Underbasin Installation In all underbasin installations the outlet must be connected to an open outlet type fitting approved by Zip heaters The diagram b...

Page 10: ...e wired with a 1 metre length of cable If in the lifetime of the unit the cable is damaged or a greater length of cable is required then to replace the supply cable refer to the following Cable instal...

Page 11: ...imply switching off the electrical supply to the unit for at least 2 minutes When power is restored the cut out will have reset However if the fault persists then the unit should be isolated from the...

Page 12: ...r no circumstances is the water heater to be used if suspected of being frozen If water ceases to flow switch off the electrical supply immediately at the isolating switch It is then recommended that...

Page 13: ...Zip does not exclude restrict or modify any liability that cannot be excluded restricted or modified or which cannot except to a limited extent be excluded restricted or modified as between the owner...

Reviews: