Zip Tudor II P4/52 Installation, Maintenance And User Instructions Download Page 1

Zip Tudor II & Contract II   

Point of use  Water Heaters

Models: 

P4/52, P4/52UB, P4/102, 

P4/102UB. C2/50, C2/100

C3/50.

Installation, Maintenance and User Instructions

Please read these instructions carefully before commencing installation of the water heater. 

Please leave these instructions with the end user after installation.

Zip Heaters (UK) Ltd
14 Bertie Ward Way
Dereham
Norfolk
NR19 1TE

Telephone: 

0845 6 005 005

Fax: 

 

01362 692448

Web:  

www.zipheaters.co.uk

The term ‘Zip’  
is a registered trademark

Issued  JUNE  2013 V1.01

Summary of Contents for Tudor II P4/52

Page 1: ...Please read these instructions carefully before commencing installation of the water heater Please leave these instructions with the end user after installation Zip Heaters UK Ltd 14 Bertie Ward Way...

Page 2: ...re commencing installation of the Point of Use Water Heater Please leave these instructions with the end user after installation To ensure you have a copy of the latest instructions visit www zipheate...

Page 3: ...ater that occurs during the heating cycle to be safely discharged During the heating cycle drips will form and fall from the delivery spout or tap and these will cease when the cycle has been complete...

Page 4: ...ce its wiring and piping must not be modified in any way In case of malfunction isolate the power supply immediately In case of leaks also isolate the water supply Repairs must only be carried out by...

Page 5: ...NO CIRCUMSTANCES SHOULD THE SPOUT OR OUTLET BE CONNECTED TO A TAP WHICH IS CAPABLE OF BEING CLOSED The Zip Tudor II and Contract II is intended for connection to mains supply only In any other case p...

Page 6: ...310x265 Minimum weight kg Empty 3 5 4 0 Maximum weight kg Full 8 5 14 0 Rated volume litres 5 10 Water connections BSP 1 2 Protection class IP24 All data quoted at nominal supply voltage For higher su...

Page 7: ...settable cut out CT0122 X 5a Thermal fuse CT0120 X 6 Neon light indicator CT0129 4 X X 7 Retaining nut CT0115 4 X X X 8 Front cover 5L CT0103 3 X 8 Front cover OB 5L CT0123 X 8 Front cover UB 5L CT012...

Page 8: ...solating valve should be installed in the water supply line to the heater A minimum clearance of 270mm is required underneath the overbasin heater units and above the underbasin units to allow for the...

Page 9: ...d Supply In Hot to Tap ZIP Approved Vented Tap Underbasin Installation In all underbasin installations the outlet must be connected to an open outlet type fitting approved by Zip heaters The diagram b...

Page 10: ...e wired with a 1 metre length of cable If in the lifetime of the unit the cable is damaged or a greater length of cable is required then to replace the supply cable refer to the following Cable instal...

Page 11: ...imply switching off the electrical supply to the unit for at least 2 minutes When power is restored the cut out will have reset However if the fault persists then the unit should be isolated from the...

Page 12: ...r no circumstances is the water heater to be used if suspected of being frozen If water ceases to flow switch off the electrical supply immediately at the isolating switch It is then recommended that...

Page 13: ...Zip does not exclude restrict or modify any liability that cannot be excluded restricted or modified or which cannot except to a limited extent be excluded restricted or modified as between the owner...

Reviews: