806835 v1.08 05.23 G5 User guide
41
Regulator
SECTION 4: User maintenance
Turn off cylinder valve & regulator.
1
2
3
4
5
6
4.4.1 Changing the 2.64kg CO2 cylinder
II
II
II
IIIIIIII
II
II
II
II
III
III
I
II
II
II
IIIIIIII
II
II
II
II
III
III
I
II
II
II
IIIIIIII
II
II
II
II
III
III
I
II
II
II
IIIIIIII
II
II
II
II
III
III
I
Unstrap.
II
II
II
IIIIIIII
II
II
II
II
III
III
I
II
II
II
IIIIIIII
II
II
II
II
III
III
I
Unscrew regulator
connection.
II
II
II
IIIIIIII
II
II
II
II
III
III
I
II
II
II
IIIIIIII
II
II
II
II
III
III
I
Replace cylinder and refit
regulator.
II
II
II
IIIIIIII
II
II
II
II
III
III
I
II
II
II
IIIIIIII
II
II
II
II
III
III
I
II
II
II
IIIIIIII
II
II
II
II
III
III
I
II
II
II
IIIIIIII
II
II
II
II
III
III
I
Strap in place.
Turn on the cylinder valve
Adjust outlet pressure 3.0 bar.
II
II
II
IIIIIIII
II
II
II
II
III
III
I
II
II
II
IIIIIIII
II
II
II
II
III
III
I
7
Test for leaks in these areas
Test for leaks by brushing
with soapy water and looking
for bubbles.
Reseal if leaking, or call Zip for
advice and assistance.
8
Purge, reset and set the CO
2
life, (see page 25).