background image

NOTE: Please ensure the bathscreen 
Is installed on the inside of the bath top. 

inside edge

MB2

BT003 / T-027

Summary of Contents for MB2

Page 1: ...NOTE Please ensure the bathscreen Is installed on the inside of the bath top inside edge MB2 BT003 T 027 ...

Page 2: ...m SP0MOBY002L R 2 1 3 4 6 7 9 8 10 11 13 2 5 12 15 1 16 15 1 1 14 SP0LFTPS SP0LFBPS Top pivot sleeve Bottom pivot sleeve x1 x1 SP0LFBPS SP0LFTPS SP0LFCS SP0LF02 Bracket bottom Leakfree Bracket top Leakfree SP0LF01 14 16 foam plastics 1 LP 123 SP0M7029 LP 123 x1 Top Bracket SP0LF01 Bottom Bracket SP0LF02 x1 x1 4x40 A2403001 4x12 A2401201 Screw 4X12mm A2403001 A2401201 1 Ensure your bath is level be...

Page 3: ...t bracket and bottom pivot bracket and then insert into the round profile Fig 1 1A 1D 2A 2B 2C 2D 2E Fig 2 TOP BOTTOM OUTS IDE OUTSI DE OUTSIDE TOP BOTTOM Bottom Top 2 Unscrew the top pivot bracket SP0LF01 and insert panel A reattach the pivot bracket Fig 2 Note Ensure pivot bracket SP0LF02 is always on the bottom of the product Top Bracket SP0LF01 Bottom Bracket SP0LF02 ...

Page 4: ...g 3 ensuring to push the end of the seal fully into the bottom bracket NOTE Silicone behind the wall profile on the bath edge if not siliconed previously edge screen lnside lnside lnside lnside lnside 3E 3A 3B 3C 3D Fig 3 Fig 4 bath Fig 4 fix wall profiiles to wall Fig 5 4 5 5 LR8387C LR8387C Bottom Top 6 mm x3 5A 5B 5C 5D Fig 5 3 Screw A2403001 ...

Page 5: ...ng Fig 7 When installation is complete seal the joint between the wall profile and the wall top to bottom Seal 50mm up where Outside only Silicone the hinge upright and the wall profile over lap 7 Drill 3 holes top middle and bottom through the wall profile and hinge upright using a 3mm steel drill bit Using the Screws A2401201 and screw cover caps 2SS008 and screw cover caps clips 2SS009 fix the hin...

Reviews: