
801314 v3.05 09.20 HT BC Commercial Instructions
Page 11 of 28
2.1
All Models
Proper air circulation must be provided for all Boiling and Chilled models. The system will operate correctly
only if the recommended air gaps are achieved during Installation. The vent duct and louvre panels must be
installed for all under floor and /or door vent systems, as instructed.
**Note:
Inlet and outlet vents should be separated by a minimum of 100mm, to avoid hot air recirculation.
IMPORTANT: Allow clearance of 50mm either side, and 200mm above the Command Centre.
!
When installing air flow ducts, the following tools will be required:
•
Jigsaw and 12mm Drill
•
Keyhole or Wall Board saw.
Section 2
Ventilation
Cool Air IN
via cabinet
floor, front
vent grille
Warm Air OUT
via kickboard louvre
Recommended Installation showing the correct air flow
**MIN.
100mm
Section 1
Tap Installation
Refer to the Tap installation instruction book 803341.
Note:
- Mains hose
length is 750mm
- Plug and Cord
length is 1800mm
Position the
Command Centre
close to the outlet
tap, within reach of
the hose and cord
lengths supplied
Note:
Note:
the hoses
the hoses
need to have a
need to have a
constant downward
constant downward
gradient to the Hy-
gradient to the Hy-
droTap to allow all
droTap to allow all
water to drain back
water to drain back
into the tanks.
into the tanks.
Min.
50mm
air gap