background image

Zip Hydroboil - Installation & Operating Instructions - 81447 - February 2004

Page 3 of 12 

10 A

2.4 kW

10 Ltr

Read These Warnings First

Please read all installation requirements, installation procedures and precautions
before installing any Hydroboil instant boiling water heater.

Never attempt to install any Hydroboil instant boiling water heater without reading
all of the applicable instructions.

In some hard water areas where mineral scale accumulation in the boiling
chamber of the Hydroboil may become a problem, consideration should be given
to the maintenance required. A suitable form of water treatment may be
necessary.

The cold water supply to this appliance must be portable and fall within your local
water authority guidelines.

All plumbing connections must be made in accordance with local authority
requirements.

The Hydroboil instant boiling water heater is not intended for use by young
children or infirm people without supervision.

Young children should be prevented from having access to ensure that they are
not able to use or play with the heater.

If the installation site is located more than 1000 metres above sea level, the
installer should contact a authorized agent to obtain alternate  PCB settings.

If the power supply cable is damaged it must be replaced by a Authorized Service
Provider or a qualified electrician.

Do not remove the cover of the heater under any circumstances without first
isolating the heater from the power supply.

Do not use strong, corrosive or abrasive cleaners to clean the case of the heater.

Frost protection: If this heater is located where ambient air temperature could fall
below 5ºC when the heater is not in use, do not turn off the appliance electrically.
This safeguard does not offer the same protection to the connecting pipework and
fittings.

The ambient temperatures this unit should operate with is 5ºC - 50ºC.

This heater is intended only for indoor use and should never be installed outdoors
or be exposed to the elements of nature.

This unit must not be positioned in an area that may be cleaned by a water jet.
This unit must not be cleaned by a water jet.

Before installing, ensure that the following are available:

a) Sufficient space to position the heater so there is at least 150 mm 

clearance above the heater for service access, 65 mm to its left and 
20 mm to its right – the tap outlet usually should be positioned at least 
200 mm above a draining board or drip tray.

b) Power supply is a fused spur for connection to the heater via a double pole

fused spur with a minimum break rating that adequately covers the maximum
power usage. Refer to table on the left.For units with 3.6 Kw element (25 ltr) or
multi element units (40 ltr) an isolating switch in the fixed wiring and attached
to a secure surface is required.

Installation Requirements

Size

Kw

Amps

15 Ltr

2.4 kW

10 A

25 Ltr

3.6 kW

15 A

40 Ltr

6.0 kW

25 A

Summary of Contents for Hydroboil HS010

Page 1: ...51 Hydroboil 10 Litre Stainless Steel HS110 11552 Hydroboil 15 Litre White HS015 11551 Hydroboil 15 Litre Stainless Steel HS115 12552 Hydroboil 25 Litre White HS025 12551 Hydroboil 25 Litre Stainless...

Page 2: ...uirements 3 Installation Procedures 4 Step 1 Positioning 4 Step 2 Fastening 4 Step 3 Connecting 5 a Plumbing 5 b Venting 5 c Electrical 6 Step 4 Assembling 6 Step 5 Commissioning 6 Problem Solving 7 O...

Page 3: ...ian Do not remove the cover of the heater under any circumstances without first isolating the heater from the power supply Do not use strong corrosive or abrasive cleaners to clean the case of the hea...

Page 4: ...er to install with concealed or exposed plumbing and or electrical connections Concealed connections are preferred for a superior appearance If the heater is used for filling cups then insert the flow...

Page 5: ...with a isolating valve which allows it to be isolated from the mains supply for servicing Water pressure requirements Minimum 0 1 bar Maximum 7 bar Warning If pressure is likely to exceed 7 bar a pres...

Page 6: ...crew the tap clockwise until the tap assembly touches the fascia without pressure Continue to turn the tap a further one full turn until the tap lever is upright Step 5 Commissioning Check previous st...

Page 7: ...s a vessel to be filled without holding your hand where it may be affected by steam Pot fill position Cup fill position Symptom Possible Cause Solution Fails to dispense water Water isolating valve tu...

Page 8: ...d during that period the text Boiling Water may not be illuminated Filter Active If your Zip Hydroboil is specified with a filter the Filter Active text will normally be illuminated This indicated tha...

Page 9: ...Mounting Template Wall template for 10 15 25 40 litre models 374 10L 15L 25L 499 40L 295 15L 25L 420 40L 591 10L 15L 771 25L 831 40L 188 10L 15L 25L 313 40L EXTERNAL PLUMBING INTERNAL PLUMBING BENCH...

Page 10: ...Cistern Float S Nut Kit 10 90495 Banjo Screw Kit 11 90110 Fascia Light Kit 12 90501 Tap Top Kit 13 90499 Fascia Lens Kit 14 90494 Metering Tube Kit 2400 w 90527 Metering Tube Kit 3600 w 90526 Metering...

Page 11: ...Zip Hydroboil Installation Operating Instructions 81447 February 2004 Page 11 of 12 Spare Parts 1 20 19 18 21 17 16 14 13 15 12 11 9 8 7 6 5 4 3 2 4 4 8 8 4 10 17...

Page 12: ...st of removal cartage and re installation of any component of the appliance if it needs to be returned for repair to Zip or its Distributor This warranty does not cover damage resulting from non opera...

Reviews: