Page 9 of 12
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Template Dimensions
38mm
1.5-3.0L
53mm
5.0-7.5L
65mm
Clearance
56mm
POSITIONING PIN
ELECTRICAL WIRING POSITION
COLD INLET POSITION
CONCEALED VENT POSITION
72mm
15
25
35mm
42mm
COLD
INLET
VENT
BENCH TOP
38mm
1.5-3.OL
53mm
5.0-7.5L
19mm
20mm Clearance
200mm Clearance
150mm
Clearance
274mm (1.5 & 3.0 L)
304mm (5.0 & 7.5 L)
318mm 1.5L
416mm 3.0L
448mm 5.0L
561mm 7.5L
Warning:
This appliance must be earthed.
Following remedial service the earthing continuity of the heater must be checked by
a qualified technician using an appliance tester, or continuity tester of accuracy Class
5 or better. Class 5 denotes an accuracy of 5% full scale deflection.
1. Isolate power supply.
2. Set meter to 0 ohm with leads connected together.
3. Connect one test lead to the earth pin on the three pin plug.
4. Connect the other test lead to a bare patch of metal (preferably on the
edge) of the top of the cover, then to the front cover of the unit, and
then to the tap top under the plastic paddle. This can be achieved by
inserting the probe up from behind the paddle without losing water.
Warning:
The water may be boiling - show extra care.
5. Test that in every instance the electrical resistance does not exceed 1ohm.
Earthing Continuity Verification & Electrical Diagram
If required, an earth continuity test
can be performed by testing between
the earth pin on the products lead and
a exposed piece of metal on the case
and the tap body.