Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Page 2 of 12
Installation Checklist
Before Installation:
A.
Read the instructions.
B.
Note: All fittings are supplied with the appliance kit except isolation
valve and pressure reduction valve, which are not supplied.
C.
Check the water quality to determine if extra filtration will be
required. A potable mains water supply must be used.
To combat the build up of lime scale, a high performance inline
filter (not supplied as standard equipment) may be ordered from
your Zip service provider. (See Product Accessories page 4)
D. Check the appliance rating plate and ensure correct power is
available for the appliance.
E. Check the wall supporting the appliance is adequate for the total
weight of the appliance, when full of water.
Before Commissioning:
1.
Check the unit has been installed correctly.
2.
Check all plumbing fittings have been tightened.
3.
Ensure the vent pipe is positioned to drain correctly.
4.
Check all electrical connections are correct and there are no loose
wires.
Commission:
7.
Flush the supply line before connecting.
8.
Turn on the water, allow to fill and check for leaks.
9.
Turn on the power.
Wall mounted Over-sink appliance for instant boiling water.
Features:
• Designed to operate within 1°C of boiling point.
• Temperature controls automatically cut off the power in the event of
temperature control failure, boil dry cutout or a blocked vent pipe.
• Incorporating a pull down tap for precision filling of cups, it also locks
‘ON’ for filling pots.
• Separates the cold water supply from the boiling chamber and the
internal condensing system retains steam within the heater.
• A stainless steel crevice free, boiling chamber with service access
ports top and bottom.
• High temperature thermal insulation with provision for service access
to the boiling chamber.
• Concealed plumbing and electrical connections.
• Choice of stainless steel or white enamelled steel case.
Description