09
Installation instructions & user manual
804544UK V2.03 Oct 2018 - Zip Econoboil
Technical support
Tel: 0345 6 005 005 Email: [email protected] www.zipwater.co.uk
Step 5 – Commissioning
Check previous steps.
Check the earth continuity (see below).
Upon installation or following service, the earthing continuity of
the Econoboil must be tested by a qualified technician using a
resistance meter of minimum accuracy of 5% full scale deflection.
• Isolate power supply.
• Verify meter ohms range, connect leads together, reading
should be 0 ohms.
• Connect one test lead to the earth
of the power lead.
• Connect the other test lead to a
cover fixing screw, then the tap.
Warning ! The water may
be boiling
• Verify that in every
instance the electrical resistance
does not exceed 1 ohm.
Warning!
This appliance must
be earthed.
Turn water supply ON. Water will flow into the Econoboil, check connections for leaks. Wait approximately 5
minutes then pull the tap forward to test for water flow.
Turn the mains electrical power ON only after the water flows freely from this outlet. After a short period, boiling
water will be available and will be maintained close to boiling point thereafter.
Use the spanner provided to tighten the lock nut.
Fit the boiling water safety label supplied in a prominent visible
position for users of the Econoboil
Do not turn the power ON until the Econoboil can dispense water from the tap outlet.
Commissioning
!
!
!
!
Note
depending upon
installation connect to
either the earth pin of the
3 pin plug, or the earth
conductor of the mains
cable.