
805194 09.17 1.02
Page 7 of 24
Installation Procedures
Step 5 –
Commissioning - Filter Flush & Calibrate
Warning: Do not turn on the power until
instructed. Water must first be available from
the tap outlet to prevent damage.
Filter Flush
1)
Ensure filter flush valve lever is rotated to down
position, see Fig.3.
2)
Turn on the mains water. Allow at least 5 litres of water
to flush through the filter. Make sure there is water
flowing from the vent outlet (i.e. the valve setting is
correct). Water should not flow into the tank.
3)
Once the filter flush is complete, rotate the valve lever
1800 (either way) to the “FILTERED” position (Fig.4).
Filling Tank
1)
Depress the lever as shown in Fig.4.
2)
Open the tap (push the lever backwards) into the locked
open position (Fig.4) and allow the tank to fill until water
flows from the tap outlet.
3)
Once the water is available from the tap, turn off the
mains water and close the tap outlet.
4)
Turn on the power to the unit (water must be in the
tank).
5)
Touch the white circle next to the left of the
[Tick]
to “Continue”
For screen operation, see the section on “Menu Operation”.
6)
Boiling Calibration will commence. It will take several
minutes for the water to boil.
Fig.3
Fig.4
Depress