801525 - Chilled HydroTap Installation Instructions - March 2016 - v3.00
Page 13 of 16
Section 4
Commissioning
•
Turn ON the water and check for any leaks.
•
Turn the power ON at the GPO
•
Familiarise yourself with the operation of the Tap, in preparation for use (See User Manual)
•
Follow the Installation instructions below (and review Section C of the User Manual).
•
After commissioning, the system may be customised by selecting further options in Section G -
Settings, within the User Manual.
1.
Turn the stop cock ON
2.
Press [Start] [Stop] buttons to start and stop the filter flush.
3.
Allow at least 10 litres of water to flush through the filter.
4.
Once the filter flush is finished, Turn the stop cock OFF
then press [Stop] to end filter flush mode.
Have a 10L bucket or similar container (not supplied) at the
ready to hold a quantity of water that will be ejected while the
Filter Flush Mode is in operation. Open the filter access door
on the front of the HydroTap and the filter cartridge will be
exposed. Located to the rear RHS of the cartridge is a flush
line, approx 600mm long and the flush line stop cock. Place
the valve end of the flush line into the 10L bucket or container.
4.2
-
Filter Flush
NOTE:
For any subsequent fi lter changes or any operational procedures, please refer to the HydroTap User
Manual, located inside the fi lter housing access door.
4.1
-
Select the Language
Initial Commissioning screen
Language selection screen
OPEN
CLOSED
Stop cock
operation