background image

Page 7 of 12 

 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2012 v1.00

Wall Mounting Template Dimensions & Electrical Diagram

274 (1.5 L & 3.O L)

304 (5.0 L & 7.5 L)

38 (1.5 L & 3.0 OL)

53 (5.0 L & 7.5 L)

65 CLEAR

56

POSITIONING PIN

EXTERNAL  PLUMBING

ELECTRICAL WIRING 
POSITION

INTERNAL PLUMBING

72

15

25

35

42

COLD
INLET

VENT

BENCH TOP

318 5.O L
416 3.O L
448 5.O L
561 7.5 L

38 (1.5 L & 3.O L)

53 (5.0 L & 7.5 L)

150
CLEAR

19

20

Summary of Contents for 1552

Page 1: ...stant boiling water 01552 Zip Hydroboil 1 5 Litre White 01551 Zip Hydroboil 1 5 Litre Stainless Steel 03552 Zip Hydroboil 3 Litre White 03551 Zip Hydroboil 3 Litre Stainless Steel 05552 Zip Hydroboil...

Page 2: ...Page 2 of 12 Zip Hydroboil Installation Operating Instructions 85264 May 2012 v1 00...

Page 3: ...ep 2 Fastening 5 Step 3 Connecting 6 a Plumbing 6 b Venting 6 c Electrical 6 Step 4 Assembling 6 Step 5 Commissioning 6 Wall Mounting Template Dimensions 7 Problem Solving 8 Earthing Continuity Verifi...

Page 4: ...o not use strong corrosive or abrasive cleaners to clean the case of the heater Frost protection If this heater is located where ambient air temperature could fall below 5 C when the heater is not in...

Page 5: ...Positioning Position the heater so the tap will drain on to a draining board or drip tray Position the base of the tap to be not less than 200 mm above the draining board height should be increased on...

Page 6: ...water drain For concealed vent plumbing connect plumbing to the vent outlet from the heater rear using a capillary elbow protruding 45 mm from the wall Alternatively attach a tun dish to the wall as...

Page 7: ...mensions Electrical Diagram 274 1 5 L 3 O L 304 5 0 L 7 5 L 38 1 5 L 3 0 OL 53 5 0 L 7 5 L 65 CLEAR 56 POSITIONING PIN EXTERNAL PLUMBING ELECTRICAL WIRING POSITION INTERNAL PLUMBING 72 15 25 35 42 COL...

Page 8: ...d Following remedial service the earthing continuity of the heater must be checked by a qualified technician using an appliance tester or continuity tester of accuracy Class 5 or better Class 5 denote...

Page 9: ...ntrol for safe filling of cups and mugs To fill larger vessels such as teapots and saucepans rotate the tap 180 degrees and depress it until it locks into a horizontal position Boiling water will flow...

Page 10: ...27 Overload kit Hydroboil 2000B 14 90501 Tap Top Kit Hydroboil 2000B 15 90562 Tap Assy complete 2000B 16 90503 Strap and key kit 1 5 3L 2000B 16 90504 Strap and key kit 5 7 5L 2000B 17 90505 Tap nut k...

Page 11: ...Page 11 of 12 Zip Hydroboil Installation Operating Instructions 85264 May 2012 v1 00 Spare Parts 2 3 3 3 4 5 6 7 8 9 9 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1...

Page 12: ...peration of the appliance the use of non authorised parts or consequential damage to any other goods furnishings or property No warranty applies to the life of any filtration cartridge installed with...

Reviews: