background image

Page 4 of 12 

 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2012 v1.00

 

Read These Warnings First

Please read all installation requirements, installation procedures and 
precautions before installing any Zip Hydroboil instant boiling water heater.

Never attempt to install any Zip Hydroboil instant boiling water heater without 
reading all of the applicable instructions.

In some hard water areas where mineral scale accumulation in the boiling 
chamber of the Zip Hydroboil may become a problem, consideration should be 
given to the maintenance required. A suitable form of water treatment may be 
necessary.

All plumbing connections must be made in accordance with local regulations.

The Zip Hydroboil instant boiling water heater is not intended for use by young 
children or infirm people without supervision. 

Young children should be prevented from having access to ensure that they are 
not able to use or play with the heater.  

If the installation site is located more than 1000 metres above sea level, the 
installer should contact a Zip authorised agent for high altitude settings.

This appliance must be earthed. If the power supply cord is damaged it must 
be replaced by a Zip authorised agent or a qualified electrician. 

Do not remove the cover of the heater under any circumstances without first 
isolating the heater from the power supply.

Do not use strong, corrosive or abrasive cleaners to clean the case of the 
heater.

Frost protection: If this heater is located where ambient air temperature could 
fall below 5ºC when the heater is not in use, do not turn off the appliance 
electrically. This safeguard does not offer the same protection to the 
connecting pipework and fittings.

The ambient temperatures this unit should operate with is 5ºC - 50ºC.

This heater is intended only for indoor use and should never be installed 
outdoors or be exposed to the elements of nature.

This unit must not be positioned in an area that may be cleaned by a water jet. 
This unit must not be cleaned by a water jet.

Before installing, ensure that the following are available:

a)  Sufficient space to position the heater so there is at least 150 mm  

 

clearance above the heater for service access,65 mm to its left and 
20 mm to its right – the tap outlet usually should be positioned at least 
200 mm above a draining board or drip tray.

b)  Standard 13 amp fused spur power outlet positioned as shown on the  

paper mounting template for connection from the rear of the heater to the 
terminal block within the heater, OR a standard 13 amp double pole fused 
spur power outlet on the wall within 1500 mm of the heater. For units with 
3.6 Kw element (25 ltr) or multi element units (40 ltr) an isolating switch in 
the fixed wiring and attached to a secure surface is required. This switch 
must provide all -pole disconnection and a contact seperation of at least 3 
mm installed in accordance with wiring rules.

Installation Requirements

Summary of Contents for 1552

Page 1: ...stant boiling water 01552 Zip Hydroboil 1 5 Litre White 01551 Zip Hydroboil 1 5 Litre Stainless Steel 03552 Zip Hydroboil 3 Litre White 03551 Zip Hydroboil 3 Litre Stainless Steel 05552 Zip Hydroboil...

Page 2: ...Page 2 of 12 Zip Hydroboil Installation Operating Instructions 85264 May 2012 v1 00...

Page 3: ...ep 2 Fastening 5 Step 3 Connecting 6 a Plumbing 6 b Venting 6 c Electrical 6 Step 4 Assembling 6 Step 5 Commissioning 6 Wall Mounting Template Dimensions 7 Problem Solving 8 Earthing Continuity Verifi...

Page 4: ...o not use strong corrosive or abrasive cleaners to clean the case of the heater Frost protection If this heater is located where ambient air temperature could fall below 5 C when the heater is not in...

Page 5: ...Positioning Position the heater so the tap will drain on to a draining board or drip tray Position the base of the tap to be not less than 200 mm above the draining board height should be increased on...

Page 6: ...water drain For concealed vent plumbing connect plumbing to the vent outlet from the heater rear using a capillary elbow protruding 45 mm from the wall Alternatively attach a tun dish to the wall as...

Page 7: ...mensions Electrical Diagram 274 1 5 L 3 O L 304 5 0 L 7 5 L 38 1 5 L 3 0 OL 53 5 0 L 7 5 L 65 CLEAR 56 POSITIONING PIN EXTERNAL PLUMBING ELECTRICAL WIRING POSITION INTERNAL PLUMBING 72 15 25 35 42 COL...

Page 8: ...d Following remedial service the earthing continuity of the heater must be checked by a qualified technician using an appliance tester or continuity tester of accuracy Class 5 or better Class 5 denote...

Page 9: ...ntrol for safe filling of cups and mugs To fill larger vessels such as teapots and saucepans rotate the tap 180 degrees and depress it until it locks into a horizontal position Boiling water will flow...

Page 10: ...27 Overload kit Hydroboil 2000B 14 90501 Tap Top Kit Hydroboil 2000B 15 90562 Tap Assy complete 2000B 16 90503 Strap and key kit 1 5 3L 2000B 16 90504 Strap and key kit 5 7 5L 2000B 17 90505 Tap nut k...

Page 11: ...Page 11 of 12 Zip Hydroboil Installation Operating Instructions 85264 May 2012 v1 00 Spare Parts 2 3 3 3 4 5 6 7 8 9 9 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1...

Page 12: ...peration of the appliance the use of non authorised parts or consequential damage to any other goods furnishings or property No warranty applies to the life of any filtration cartridge installed with...

Reviews: