12
Assembly
1.
Stick the sealing tape on the edge of the funnel, it takes approximately 3 rolls.
2.
Mount the funnel to the base by means of the M6x12mm bolts.
3.
Now mount the legs to the base with the M8x20mm bolts.
4.
Now mount the cross legs against the legs with the M8x20mm bolts, Ø8 rings (2x), Ø8 lock
rings and M8 nuts.
5.
Place the sealing tape onto the base
(approximately 3 rolls needed) and place
the grids on the base frame.