16  |  Installation Instructions

6.  Connect Ethernet cable to the Faceplate (top left panel inside door) if any remote monitoring of the Battery Cabinet is 

desired.

a.  Configuration details are provided in the Operations Manual.

7.  Apply AC Power to the system

a.  It will take approximate 1-3 minutes for the BMS/R3000-U to initialize and communicate with the server. See 

Generic R3000-U Manual for setup details.

• 

The network requirements needed for the R3000 to communicate with the Cloud or Local server:

1. 

Local DHCP assigned IPv4 address 

 

Inbound and Outbound permit TCP/443 and TCP/9101 to:

  139.177.197.251

  173.255.231.159

  172.105.103.167

  45.33.95.14

2. 

Outbound permit tcp/3030, tcp/9101 to 172.105.23.38

b.  If using the Cloud server, go to website to verify system is online: https://manage.anzenbms.com/

c.  The system will begin in “Pre-standby state” until DC Power is applied

d.  Confirm all batteries are /-0.3V of one another. Since all batteries ship between 30-50% State of Charge it  

 

is likely the batteries will be around 13.5 +/- 0.3V.

8.    Enable the DC Power (UPS/Charger)

a.  Ensure UPS or battery charger is set properly to manufacturers recommended settings for operation with

the battery system.

b.  Close the Breaker with the system in the “Pre-standby State.”  The system will immediately go into “Standby 

 

state” which means it is ready to function.

c.  The system will transition immediately into a “Charge State” if the SOC is below 90% and battery 

 

temperatures are all  > 15C and < 40C.

Note: If system was recently power cycled it may try to go into CHARGE state regardless of the SOC.

9.    Perform a full or partial discharge (if possible) to confirm the system is working properly.

a.  Confirm system shuts down properly with no system errors.

Figure 8. BMS and Power Tray Component Layout

Summary of Contents for BC 2-500

Page 1: ...DRAWN MATERIAL INTERPRET GEOMETRIC TOLERANCING PER ANSI Y14 5 2009 PROPRIETARY AND THE INFORMATION CO DRAWING IS THE SOLE ZINCFIVE ANY REPRO OR AS A WHOLE WITH PERMISSION OF ZINCFI DIMENSIONS ARE IN m...

Page 2: ...Copyright 2023 ZincFive Inc All rights reserved...

Page 3: ...s Manual 5 Disclaimer 6 Safety 6 Safety Symbols 7 Battery Safety 8 Battery Warnings and Cautions 8 Specifications 9 Safety Precautions 9 Tools 10 Pr cautions de s curit 10 Outils 11 Shipping and Unpac...

Page 4: ...product returns please contact a ZincFive support representative to obtain a return material authorization RMA ZincFive Inc 20170 SW 112th Ave Tualatin Oregon 97062 Customer is responsible to properly...

Page 5: ...ort representative visit zincfive com support or call 888 517 7776 Disclaimer While efforts have been made to ensure the accuracy and validity of information contained in the document ZincFive assumes...

Page 6: ...rotective Earth Ground Symbol Used to designate a connection point to ground CAUTION Symbol DANGER An electrical danger exists in this area Use extreme caution at all times DANGER Symbol Symbole d att...

Page 7: ...tools with insulated handles c Wear rubber gloves and boots d Do not lay tools or metal parts on top of batteries e Disconnect charging source and load prior to installing or maintaining the battery...

Page 8: ...Retirer le raccordement la terre si une partie de la batterie est d termin e comme tant mise la terre Remarque R f rez vous la fiche de donn es de s curit du Z5 13 80 HSF ou 13 90 USF pour des instruc...

Page 9: ...ge the batteries must not be stored more than six months without recharging If attached to a UPS that remains de energized for a long period ZincFive recommends you energize the UPS system every six m...

Page 10: ...dur e il ne faut pas entreposer les batteries plus de six mois sans les recharger Si reli une ASI qui reste inerte pendant une p riode prolong e ZincFive vous recommande d alimenter l ASI tous les si...

Page 11: ...ap downs on the batteries Everything will remain secure in place 4 Perform a visual inspection of the cabinet a Open the door and examine all the batteries drawers to make sure everything is still sec...

Page 12: ...d always wear proper safety equipment including eye protection The cabinet voltage will exceed 500V between some of the batteries components 1 Inspection of the Batteries installed a Visual and torque...

Page 13: ...connection b Positive conductor s will be attached to Terminal 1 top of breaker c Negative conductor s will be attached to Terminal 3 top of breaker d The circuit breaker torque and wire details Torqu...

Page 14: ...ls Use 75 90 C rated or higher between 14 to 10 AWG 2 5 to 5 0 mm2 solid stranded copper b AC GND connects to temrinal block and requires 9MM stripped length Torque screws to 0 7Nm 6 19in lb Faceplate...

Page 15: ...S top Box are secure and the proper BX 50 to cabinet configuration has been completed by an authorized service personnel Figure 6 AC Input wiring on right side at front of cabinet and ON OFF Switch Fi...

Page 16: ...anzenbms com c The system will begin in Pre standby state until DC Power is applied d Confirm all batteries are within 0 3V of one another Since all batteries ship between 30 50 State of Charge it is...

Page 17: ...STRIP DETAILS ON SHEETS 14 AND 15 FOR ADDITIONAL 7 INFORMATION INSTALL THE DOORS AND LOCK WHEN NOT OPEN FOR MAINTENANCE 8 THE CABINET IS RATED FOR SEISMIC INSTALLATIONS ACCORDING TO IBC 2018 CONTACT Z...

Page 18: ...18 Installation Instructions Appendix B BUSBAR BATTERY POSITIVE TERMINAL BATTERY NEGATIVE TERMINAL 10 9 12 13 14 8 9 1 N m 0 9 N m OBSERVE LOCATION THERMISTOR IN STACKUP H02 C D E 4 3 2 1...

Page 19: ...Installation Instructions 19 Appendix C...

Page 20: ...20 Installation Instructions Notes...

Page 21: ...Copyright 2023 ZincFive Inc All rights reserved...

Page 22: ...ZincFive Inc 20170 SW 112th Ave Tualatin Oregon 97062 zincfive com support 01100 00400 00104 rev H03 Copyright 2023 ZincFive Inc All rights reserved...

Reviews: