9
10 Installation
WARNING
Risk of injury due to uncontrolled movements
Risk of injury in case of unexpected movement of the machine or system into which the product is to be installed.
►
Switch off the energy supply of the machine before any work.
►
Secure the power supply against being switched on unintentionally.
►
Check the machine for any residual energy that may be present.
NOTICE
►
Installation may only be carried out by qualified personnel in accordance with these installation and operating
instructions.
►
Switch off the power supply before any assembly, installation or maintenance work.
NOTICE
Non-compliance may result in material damage.
Malfunctions and unit damage if the tool flange and housing are disconnected from each other.
►
Make sure that the tool flange and housing are not disconnected from each other during disassembly.
►
If the tool flange and housing are accidentally disconnected, observe the following instructions.
►
Do not touch the electrical sliding contacts in the interior.
►
Carefully reconnect the tool flange and housing.
INFORMATION
Requirements for the mounting surface:
• Permissible unevenness: 0.03 mm
Further installation information:
• The mounting screws are not included in the scope of delivery.
• Strength class of the mounting screws is at least 8.8 (DIN EN ISO 4762)
• Screw-in depth in accordance with DIN EN ISO 9409-1
►
Observe the tightening torque of the mounting screws.
►
Verify the permitted load capacity of the required screw connections in accordance with VDI 2230.
INSTALLATION AND OPERATING INSTRUCTIONS:
DVR
DDOC00222 / g
EN / 2022-01-13
Zimmer GmbH • Im Salmenkopf 5 •
77866 Rheinau, Germany •
+49 7844 9138 0 • www.zimmer-group.com
Summary of Contents for DVR Series
Page 2: ......