background image

INSTALLATION AND  

OPERATING 

INSTRUCTIONS

Rotary distributor

DVR series

DDOC00222

THE KNOW-HOW FACTORY

Summary of Contents for DVR Series

Page 1: ...INSTALLATION AND OPERATING INSTRUCTIONS Rotary distributor DVR series DDOC00222 THE KNOW HOW FACTORY ...

Page 2: ......

Page 3: ...stallation 9 10 1 Installing the product 10 10 2 Installing the energy supply 12 10 2 1 Installing the wiring 12 10 2 2 Installing the pneumatic system 14 10 3 Connecting the sealing air 14 10 4 Attaching the torque support arm 15 10 5 Installing accessories 15 11 Maintenance 16 12 Decommissioning disposal 16 13 RoHS declaration 17 14 REACH declaration 17 15 Declaration of Incorporation 18 INSTALL...

Page 4: ...ding these dangers Ö The warning symbols are assigned according to the type of danger WARNING This notice warns of a situation that is potentially hazardous to personal health Ignoring these notices can cause serious injury or damage to health You absolutely must comply with the described measures for avoiding these dangers Ö The warning symbols are assigned according to the type of danger CAUTION...

Page 5: ...e manufacturer Use of the product under extreme conditions such as aggressive fluids or abrasive dusts Additional drilled holes or threads Ö Zimmer GmbH shall accept no liability for any damage caused by improper use The operator bears sole responsibility Make sure that the power supply is disconnected before you mount adjust modify maintain or repair the product Whenever work is carried out on th...

Page 6: ...parameter limits and operating conditions stipulated in the order confirmation The product is designated for use in closed facilities Direct contact with perishable goods food is not permitted 4 Personnel qualification Installation commissioning and maintenance may only be performed by trained specialists These persons must have read and understood the installation and operating instructions in fu...

Page 7: ... as a stator by means of the torque support arm The energy media to be transferred is brought in here The robot flange and the connecting flange on the tool are the rotating elements The structural design of the connecting flange is based on the specifications from DIN EN ISO 9409 1 1 Pneumatic feed through 2 Sealing air connection 3 Connecting flange on the robot 4 Energy and data transmission 5 ...

Page 8: ...ansport to ensure that no unexpected movements can occur Before commissioning the product and after transport check all power and communication connections as well as all mechanical connections If the product is stored for an extended period the following points are to be observed Keep the storage location as dust free and dry as possible Avoid temperature fluctuations observe and adhere to the te...

Page 9: ... each other Make sure that the tool flange and housing are not disconnected from each other during disassembly If the tool flange and housing are accidentally disconnected observe the following instructions Do not touch the electrical sliding contacts in the interior Carefully reconnect the tool flange and housing INFORMATION Requirements for the mounting surface Permissible unevenness 0 03 mm Fur...

Page 10: ...lange The tool or tool changer can then be installed on the product Remove the central screw 3 9 bm bl Remove the robot side connecting flange Insert the straight pin into the designated fit on the robot side connecting flange Position the robot side connecting flange onto the robot flange by using the straight pin Install the robot side connecting flange onto the robot flange by using the mountin...

Page 11: ...e connecting flange by using the straight pin Use the mounting screws to mount the tool on the tool flange 7 Connecting flange on the tool bn Straight pins bo Mounting screw INSTALLATION AND OPERATING INSTRUCTIONS DVR DDOC00222 g EN 2022 01 13 Zimmer GmbH Im Salmenkopf 5 77866 Rheinau Germany 49 7844 9138 0 www zimmer group com ...

Page 12: ... control system of the product 10 2 1 1 Pin assignment of DVR40I4 and DVR50I4 Pin Socket 1 2 3 4 3 4 1 2 1 1 2 2 3 3 4 4 10 2 1 2 Pin assignment of DVR63I6 and DVR80I6 Pin Socket 5 4 3 2 1 9 8 7 6 1 9 5 4 3 2 8 7 6 1 1 2 2 3 3 4 4 5 5 6 6 7 n c 7 8 n c 8 9 n c 9 INSTALLATION AND OPERATING INSTRUCTIONS DVR DDOC00222 g EN 2022 01 13 Zimmer GmbH Im Salmenkopf 5 77866 Rheinau Germany 49 7844 9138 0 ww...

Page 13: ...of DVR125I4 DVR125I8 DVR160I4 and DVR160I8 Pin Socket 5 4 3 2 1 6 7 8 9 10 11 12 13 14 15 5 4 3 2 1 6 7 8 9 10 11 12 13 14 15 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 n c 13 14 n c 14 15 n c 15 INSTALLATION AND OPERATING INSTRUCTIONS DVR DDOC00222 g EN 2022 01 13 Zimmer GmbH Im Salmenkopf 5 77866 Rheinau Germany 49 7844 9138 0 www zimmer group com ...

Page 14: ...ousing Robot input bq Outer edge of tool flange Tool output NOTICE Close off unused connections using suitable dummy plugs The authorized connections that are available can be found in the accessories list on our website The necessary ordering information can also be found there Use compressed air in accordance with DIN ISO 8573 1 2 4 1 10 3 Connecting the sealing air NOTICE Non compliance may res...

Page 15: ...ter for the torque support arm using the dimensions from the dimensional drawing on the data sheet Arrange the pin of the torque support arm parallel to the turning axis or casing surface of the product Maintain a parallelism tolerance of 0 1 mm br 5 bs 5 Torque support br Specification for pin diameter bs Pin 10 5 Installing accessories NOTICE Before installing an accessory make sure it is suitab...

Page 16: ... the following circumstances Dirty environment Improper use and use that does not comply with the power specifications Ambient temperature is too high Even though the product is maintenance free as mentioned above perform a regular visual inspection to check for any corrosion damage or contamination Have maintenance work be performed by Zimmer Customer Service whenever possible Ö Dismantling and r...

Page 17: ...EACH declaration In terms of the EC Regulation 1907 2006 Name and address of the manufacturer Zimmer GmbH Im Salmenkopf 77866 Rheinau Germany 49 7844 9138 0 info zimmer group com www zimmer group com REACH stands for Registration Evaluation Authorisation and Restriction of Chemicals A full declaration of REACH can be obtained from the manufacturer due to the duty to notify in accordance with Art 3...

Page 18: ...ific technical documents were produced in accordance with Annex VII Part B of this Directive We undertake to provide the market supervisory bodies with electronic versions of special documents for the incomplete machine through our documentation department should they have reason to request them The incomplete machine may only be commissioned if it has been ascertained if applicable that the machi...

Reviews: