STW1000V2
12090-0709-00
Page
4 / 6
www.ziehl.de
7
Important Information
DANGER!
Hazardous voltage!
Will cause death or serious injury. Turn off and lock out all power
supplying this device before working on this device.
Before connecting the power supply Us, check if the connected
supply voltage matches the defined supply voltage on the type of plate.
To use the equipment flawless and safe, transport and store properly, install and start professionally and
operate as directed.
Only let persons work with the equipment who are familiar with installation, start and use and who have
appropriate qualification corresponding to their function. They must observe the contents of the instruction’s
manual, the information which are written on the equipment and the relevant security instructions for the
setting up and the use of electrical units.
The equipment is built according to DIN VDE/EN/IEC and checked and leave the plant according to security
in perfect condition. If, in any case the information in the instruction’s manual is not sufficient, please contact
our company or the responsible representative.
To maintain this status, you must obse
rve the safety regulations entitled “caution” in this operating manual.
Failures to follow the safety regulations can result in death, personal injury, or property damage to the device
itself and to other devices and facilities.
To maintain this condition,
you must observe the safety instructions in this instruction manual titled “Important
Information”. Failure to follow the safety instructions may result in death, personal injury, or property damage
to the equipment itself and other equipment and facilities.
Instead of the industrial norms and regulations written in this instruction manual valid for Europe, you must
observe out of their geographical scope the valid and relevant regulations of the corresponding country.
8
Installation
•
mount on 35 mm mounting rail according to EN 60715
•
wall-mount with 3 x screws M4
•
connecting wires refer to the connection plan to prevent miss-operation and malfunction.
9
Commissioning
Apply control voltage and voltage/current signal according to the wiring diagram.
Select the range and relay function by connecting the optional jumpers to terminals 1
– GND and 2 – GND.
Set limit values and delay times on the potentiometers.