background image

Zeus Technology Co., Ltd. Shenzhen

4

2.The boot

1. connecting wiring and battery battery tester between. Red clip connect the
battery positive, black clip connect the battery negative. If red or black clip
clip connection is not reliable, the following diagram interface 1.0 and Figure
1.1 shows, there is a problem at this time need to disconnect to reconnect to
clip.

2.wiring to normal after device initialization is successful, the

display will automatically boot interface (as shown below), press any
key to continue.

2.0

2.1

2.2

Summary of Contents for MST-8000+

Page 1: ...1 Battery Analyzer MST 8000 Instructions...

Page 2: ...gy Co Ltd Shenzhen 2 1 Appearance 3 2 The Boot 4 3 Functional Test 5 a Battery test 5 b Starting System Test 7 c Charging System Test 7 d Maximum load test 8 5 System Settings 9 a Language Settings 9...

Page 3: ...Selection function or set of data 6 down key Selection function or set of data 7 Escape key Esc Exit current page or return to the previous level 8 OK key Enter OK option or enter the next level 9 det...

Page 4: ...battery negative If red or black clip clip connection is not reliable the following diagram interface 1 0 and Figure 1 1 shows there is a problem at this time need to disconnect to reconnect to clip...

Page 5: ...ntinue measuring Esc key to abandon measurement If the battery voltage is normal it will go directly to the battery type selection screen Figure 3 1 2 On the subject of battery type battery by selecti...

Page 6: ...ter letters numbers there is a small part of the sign Select the digits to enter When you re finished press Enter to save the print Esc key does not save print 3 1 6 print result shown in Fig Note 1 b...

Page 7: ...oltage value is greater than 9 6V then start the system normally If less than 9 6V shows the battery voltage is too low to start check that the relevant part of the connection points lines and starter...

Page 8: ...eck the connections lines and alternators Note If the 24v system the reference voltage value can be multiplied by two test result print operations can refer battery test results printing operation d M...

Page 9: ...ure 3 5 1 Figure 3 5 2 below available in English Portuguese Spanish French German Italian Russian Simplified Chinese Japanese Turkish Traditional Chinese total of 11 kinds to choose from Use the arro...

Page 10: ...Zeus Technology Co Ltd Shenzhen 10 arrow keys Select the object to change adjust the value Press Enter to save the changes after modify press Esc key to discard changes...

Reviews: