ALL EVENTS OTHER THAN MAINTENANCE WORK OR FALSE ALARMS 

 

DATE TIME 

 LOOP 

ADDRESS 

ZONE / LOCATION 

DETAILS OF EVENT  
(INCLUDING CAUSE IF KNOWN) 

ACTION 

REQUIRED  

DATE 

COMPLETED 

INITIALS 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for NPAD 2

Page 1: ...USER MANUAL MAINTENANCE GUIDE LOG BOOK...

Page 2: ...SOUNDERS 7 5 3 A SECOND ALARM SIGNAL FROM A NEW DETECTION ZONE 7 5 4 TURNING ON THE ALARM SOUNDERS FROM THE FACP I E TO EVACUATE THE BUILDING 7 5 5 RESETTING THE PANEL 7 6 THE FAULT CONDITION 8 6 1 D...

Page 3: ...e fire brigade To reset the panel press the reset button If the panel goes back into alarm silence the sounders and call the engineer What to do if the Fire Alarm Panel shows a Fault Yellow LED Write...

Page 4: ...ny evacuation procedure Alarms can come from Smoke or Heat Detectors or manually by a person operating a Manual Call Point Splits the building into Zones each covering a different area of the building...

Page 5: ...ly Call point elements held on site 47 2 j 1 2 11 In the event of a prealarm determine the cause take appropriate action predetermined fire routine if the cause is the start of a fire arrange maintena...

Page 6: ...et return panel to normal condition To silence a panel after an alarm press Stop Start followed by silence Record the LCD details in the log book then press Reset The previous Next buttons by the LCD...

Page 7: ...e menu iv TEST MODE SELECTION FOR TEST ENGINEER ONLY This access level is obtained by pressing the test button and entering the test code This is a factory preset code which cannot be changed Here the...

Page 8: ...unders will stop within 2 seconds Sounder bases can take up to 8 seconds to stop If the START STOP button is pressed again during this time the panel will start the sounders again 5 3 A SECOND ALARM S...

Page 9: ...there is a problem with the mains supply or one of its fuses Low Battery indicates that the battery voltage has dropped below 21 volts and that these batteries are no longer working If the mains suppl...

Page 10: ...ine sounder fault LED will light along with the zone that contains that sounder 6 2 WHAT TO DO IF A FAULT CONDITION OCCURS If a fault occurs the responsible person should Turn keyswitch to Controls en...

Page 11: ...der needs to be disabled then press DISABLEMENT SELECT again until the required zone or sounder is selected 5 If the panel needs to be taken out of SELECT DISABLEMENT MODE eg to silence a fault on ano...

Page 12: ...ut The Sounder Circuits OUTPUT ROUTING INFORMATION TYPE OF OUTPUT CONNECTED WHAT HAPPENS WHEN ACTIVATED Auxiliary Output Yes No Fault Output Yes No ADDITIONAL INFORMATION Any additional information th...

Page 13: ...5 4 97 7 14 1 56 4 98 7 15 1 57 4 99 7 16 1 58 4 100 7 17 2 59 4 101 7 18 2 60 4 102 7 19 2 61 4 103 7 20 2 62 4 104 7 21 2 63 4 105 7 22 2 64 4 106 7 23 2 65 5 107 7 24 2 66 5 108 7 25 2 67 5 109 7 2...

Page 14: ...1 56 4 98 7 15 1 57 4 99 7 16 1 58 4 100 7 17 2 59 4 101 7 18 2 60 4 102 7 19 2 61 4 103 7 20 2 62 4 104 7 21 2 63 4 105 7 22 2 64 4 106 7 23 2 65 5 107 7 24 2 66 5 108 7 25 2 67 5 109 7 26 2 68 5 110...

Page 15: ...ding work or panel conditions This LOG BOOK must be available for inspection at all times You can photocopy this log book to provide extra pages for when this book is full BS5839 part 1 recommends tha...

Page 16: ...NTENANCE GUIDE LOG BOOK Approved Document No GLT MAN 106A PAGE 15 Issue 2 00 Authorised GH Date 16 07 2007 MAINTENANCE WORK DATE TIME LOOP ADDRESS ZONE LOCATION REASON FOR WORK WORK CARRIED OUT ADDITI...

Page 17: ...No GLT MAN 106A PAGE 16 Issue 2 00 Authorised GH Date 16 07 2007 FALSE ALARMS DATE TIME LOOP ADDRESS ZONE LOCATION CAUSE IF KNOWN OR ACTIVITIES IN ALARM AREA MAINTENANCE VISIT NEEDED YES NO MAINTENAN...

Page 18: ...roved Document No GLT MAN 106A PAGE 17 Issue 2 00 Authorised GH Date 16 07 2007 ALL EVENTS OTHER THAN MAINTENANCE WORK OR FALSE ALARMS DATE TIME LOOP ADDRESS ZONE LOCATION DETAILS OF EVENT INCLUDING C...

Page 19: ...all points detectors can signal an alarm condition and indicate the correct zone and text message on the fire alarm panel The Sound pressure level throughout the building should be checked for complia...

Page 20: ...ecommendations of section 2 of BS 5839 1 2002 for the system category described below except for the variations if any stated in this certificate Name in block letters Position Signature Date For and...

Page 21: ...een provided to the user to enable limitation of false alarms Other measures as follows INSTALLATION COMMISSIONING RECOMMENDATIONS It is strongly recommended that installation and commissioning be und...

Page 22: ...ted in this certificate Name in block letters Position Signature Date For and on behalf of Address Postcode The extent of liability of the signatory is limited to the system described below Extent of...

Page 23: ...the Fire Alarm System installed at Premier AD Address Installation work is as far as can be reasonably ascertained of an acceptable standard The entire system has been inspected and tested in accorda...

Page 24: ...m System installed at Address The following work is required before the system can be accepted All installation work appears to be satisfactory The system is capable of giving a fire alarm signal The...

Reviews: