Z8X-UM01 Rev.A
INSTRUCTION MANUAL
Zerun Co., LTD
( No.16 Yaxi Road, Zhixi Town, Jintan District, Changzhou City, 213251 Jiangsu , China )
9
Note that the polarity of junction belt and outlet position are consistent with that of junction box.
The bus bar is connected to the module diode by resistance welding with an electrode.Below picture
show the defeil.
Figure 7
All the wiring steps shall be going with the operators wearing
anti-static gloves.
Note: After welding,bus hight must lower than diode tongue piece,or must be trimmed
3.4
POTTING
Place the model horizontally, then pour the potting glue evenly into the junction to the overflow
surface ,as picture 8.
Figure 8
ntion:
During the potting, Make sure all the conductors be covered!
A full cure requires 24 hours at room temperature before the photovoltaic module can be connected and
tested.