
Z3N/Z3NU/Z3NN/Z3NNU/Z3NW/Z3NWU 75-100
46
Lubrication and fluid level check
www.zepro.com
Image 59. Lubrication points
9
Lubrication and fluid level check
The following lubrication points must be greased on installation. They must then be lubricated at least 4
times a year.
9.1
Lubrication
NOTE!
The lift should be lubricated with LE lubricant 4622 or equivalent..
1. Right tilt cylinder, at lower bearing.
6. Lift cylinder, at upper bearing.
2. Lift cylinder, at lower bearing.
7. Right tilt cylinder, at upper bearing.
3. Left tilt cylinder, at lower bearing.
8. Lift arm right side, at upper bearing.
4. Lift arm left side, at upper bearing.
9. Lift arm right side, at lower bearing
5. Left tilt cylinder, at upper bearing.
10. Lift arm left side, at lower bearing.
9.2
Oil level check
Check the fluid level in the tank during service, top up if necessary. The marking on the hydraulic tank indi
-
cates the type of hydraulic fluid used. Mineral hydraulic fluid, product no. 21963 (1 litre), or biodegradable
synthetic fluid, product no. 22235 (1 litre).
3
8
5
7
4
6
9
10
1
2
Summary of Contents for Z3N 75-100
Page 2: ......