9
Installation –
Mounting the Hood
Hood is intended to be mounted to a fi nished ceiling.
1.
Ceiling Preparation:
Determine hood mounting location and temporarily tape paper template (incluided with the
hood) to the ceiling. Cut-out internal shaded area of template to allow the ductng and electrical to pass through.
Add wood blocking (min. 2” x 4”) onto ceiling joists to refi nforce ceiling above the drywall. (FIG. A, #1) Secure (2)
1-
1/2
” wood screws into points A and B of the paper template (FIG. B). Do not completely tighten screws, leave
approx. 1/4” exposed.
2.
Hood Preparation:
Remove screws securing top and bottom support frames together. Adjust support frame to
accomodate the desired hood height and re-assemble the frame using the previously removed screws (2 screws
for each support frame arm). (FIG. A, #2).
3
1
2
6
5
4
Ceiling Joists
Wood Blocking
Top Support Frame
Bottom Support Frame
Hood Body/Canopy
front
A
B
Front of Hood
C L
/
Cut-Out Shaded Area
FIG. A
FIG. B
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
PAPER TEMPLATE
Summary of Contents for ZMD-E42AS
Page 2: ...www zephyronline com...
Page 21: ...19 Fan Curve Diagrams...
Page 26: ...www zephyronline com...