Fixed Hoist Test Facility Operation and Maintenance Manual
ZOM-12000-7 rev 0
Page 17 of 24
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 2006-2008
Installing the UUT
o
To install the UUT the hanging hoist mount is lowered by raising the
hoist mount with the chain hoist hand control just enough to allow
removing the pins from the lower load cell clevis.
o
Remove the pins and then lower the hanging mount to the lower
position as shown.
o
Install the UUT onto the post mount and install two ¼ inch pins.
o
Using the hand control raise the hanging hoist mount up to reattach
the two clevis pins, then lower the chain hoist to apply all the weight to the load
cells.
o
Mount the electrical control boxes in the opening on the frame as shown.
Pilot Control Panel
Crew Control Panel
3 Phase Power Receptacle
Load Cell Readout
28 VDC power on switch
Post Mount
Hanging Hoist Mount