17
Roma Groove Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Mounting the Hood
At least two installers are required due to the weight and size of
the hood.
CAUTION
1. Adjust the mounting brackets by loosening (2)
pre-installed screws per bracket.
2. Mount the component box bracket onto
the hood with (2) M4 x 8 screws with the
component box facing outwards.
3. Measure from the range top to the hood
bottom and mark line A (24” minimum from
range top).
4. Mark the center line vertically.
5. Measure 11-3/8” above line A and mark the
hood height, line B.
6. Measure 5-1/8” on line B from the C/L and
mark the mounting spread.
7. Mark the mounting spread vertically until a
cross has been formed to determine the exact
placement of the M6 x 1” screws.
8. Fasten (2) M6 x 1” screws into the studs on line
B, but do not fully tighten them.
NOTE:
Wood blocking may need to be added
behind the drywall if no studs are present.
Wall anchors may also be used but check
local codes for compliance. Failure to use
suitable wall anchors and screws to hold the
weight of the hood could result in personal
injury or damage to the cooking surface or
counter.
24” min.
A
B
Duct Cover Bracket
C/L
FIG. A