background image

12

8. Electrical connection

WARNING

Electrical Shock Hazard

Warning: Turn off power circuit at the service panel

before wiring this unit.

120 VAC, 15 or 20 Amp circuit required.

ELECTRICAL GROUNDING INSTRUCTIONS

THIS APPLIANCE IS FITTED WITH AN ELECTRICAL

JUNCTION BOX WITH 3 WIRES, ONE OF WHICH

(GREEN/YELLOW) SERVES TO GROUND THE

APPLIANCE.  TO PROTECT YOU AGAINST ELECTRIC

SHOCK, THE GREEN AND YELLOW WIRE MUST BE

CONNECTED TO THE GROUNDING WIRE IN YOUR

HOME ELECTRICAL SYSTEM, AND IT MUST UNDER

NO CIRCUMSTANCES BE CUT OR REMOVED.

Failure to do so can result in death or electrical

shock.

Facing the front of the range hood, remove the left

knockout and the Junction box cover and install the

conduit connector (cULUS  listed) in junction box.

knockout

J-Box

cover

Run 3 wires; black, white and green ,according to the

National Electrical Code and local codes and

ordinances, in 1/2" conduit from service panel to

junction box.

J-Box cover

Conduit

Connect black wire from service panel to black or red in

junction box, white to white and green to green-yellow.

Close junction box cover.

9. Note: 

disregard this step if the hood has been fitted

with an integralventilator.

Purchase and install a Remote ventilator (see

paragraph „Before installing the hood - Parts not

supplied“ for model reference).

10. For non-vented (recirculating) installations ONLY:

Install one charcoal filter.

11.

 Assemble the canopy with the integral ventilator

housing (chimney structure):

a.

Remove the grease filter (see also Care & Use

section - Charcoal filter).

b.

Thread completely the lower part of the hood

onto the integral ventilator housing rails.

Note: control panel on canopy and  electronic

box on chimney structure should be on the same

side.

c.

Make alla cable connections:

LAMPS

CONTROL

PANEL

Inst

allation

Summary of Contents for EAL-E42ASX

Page 1: ...JAN06 0101...

Page 2: ...eave these Instructions with this unit for the owner OWNER Please retain these instructions for future reference Safety Warning Turn off power circuit at service panel and lock out panel before wiring...

Page 3: ...sions and clearances 7 Installation Instructions 8 Venting methods 8 Preparation 8 Installation Ductwork Calculation Sheet 9 Installation 10 Electrical connection 12 Description of the hood Controls 1...

Page 4: ...his Hood With Any External Solid State Speed Control Device WARNING TO REDUCE THE RISK OF A RANGE TOP GREASE FIRE a Never leave surface units unattended at high settings Boilovers cause smoking and gr...

Page 5: ...local codes and ordinances A U L or C S A listed conduit connector must be provided at each end of the power supply conduit at the range hood and at the junction box Copies of the standards listed may...

Page 6: ...e PARTS NOT SUPPLIED Duct conduit and all tools required for installation Ductless Recirculating Kit to be used only in the Ductless recirculating version includes charcoal filter charcoal filter supp...

Page 7: ...ronline com Dimensions and clearances 14 12 3 16 42 48 26 12 16 27 7 16 1 2 16 min 32 6 16 min 31 7 16 max 48 7 16 Ductless recirculating version ONLY Note if necessary order the proper duct cover ext...

Page 8: ...um Duct Size Ducting Ductless version 8 Round Pipe PREPARATION Do not cut a joist or stud unless absolutely necessary If a joist or stud must be cut then a supporting frame must be constructed Fitting...

Page 9: ...und wall cap with damper 6 Round roof cap 6 Round to 3 1 4 x 10 rect transition 6 Round to 3 1 4 x 10 rect transition 90 elbow 7 round 90 elbow 7 round 45 elbow 6 Round wall cap with damper 6 Round ro...

Page 10: ...rked on ceiling to position the mounting template Note location of hood front that indicated with a printed arrow side and mounting holes indicated on template Note Remember that printed arrow on temp...

Page 11: ...6 7 8 FRONT 4 For non vented recirculating installations ONLY Fix the deflector on the chimney structure 5 Note disregard this step if is intended to install a remote ventilator Purchase and install...

Page 12: ...ite and green according to the National Electrical Code and local codes and ordinances in 1 2 conduit from service panel to junction box J Box cover Conduit Connect black wire from service panel to bl...

Page 13: ...s squere slots and fix each other with 6 screws 3 per side Rectangular slots Plan diagram top sections Nut top sections Chimney Structure 13 Install top duct covers assembly to the chimney structure F...

Page 14: ...top view rear bottom duct covers section snap into place 15 Fit the front bottom duct covers section and fix both sections with 8 screws each other the lower screws fix duct cover to canopy front bot...

Page 15: ...e in their sockets Turn power on in service panel Check lights and blower operation per Care Use section of this manual If range hood does not operate Check that the circuit breaker is not tripped or...

Page 16: ...cases of concentrated kitchen vapours It is recommended that the cooker hood suction is switched on for 5 minutes prior to cooking and to leave in operation during cooking and for another 15 minutes a...

Page 17: ...d or in the dish washer which must be set to a low temperature and a short cycle When washed in a dish washer the grease filter may discolour slightly but this does not affect its filtering capacity T...

Page 18: ...g area are affecting the ventilation of the hood 3 Blocking in the duct opening or ductwork 4 The direction of duct opening is against the wind 5 Using the wrong size of ducting 1 Metal filter is loos...

Page 19: ...nce misuse abuse accident Improper installation and failure to follow installation instructions When product is used commercially or other than its intended purpose Damaged because of improper connect...

Page 20: ...on Part halogen bulb 12V 20 W metal filter Part Description Part Ductless Recirculating Kit charcoal replacement filter duct cover extension kit internal blower 600 cfm in line blower 1100 cfm ZRC 00A...

Page 21: ...21 www zephyronline com...

Page 22: ...22...

Reviews: