www.zephyronline.com
4. Remove the (2) screws to unlock the top support frame from the bottom support
frame. Fig.4.
5. Secure the top support frame to the duct
cover ceiling bracket by using the (4)
screws. Fig. 5
6. Position hole template on the ceiling paying
attention that the arrow is positioned on
the same side as the range hood controls.
- Make 4 holes in the ceiling and drive in (3)
screws without completely tightening
them. Pay attention not to insert the screw
into the hole marked with an X on the hole
template. Fig.6
7. Lift the hood assembly to the ceiling and
align the top support frame and ceiling bra-
cket with the (3) screws previously installed
in the ceiling.
Rotate assembly slightly clockwise to lock in
place.
Drive in the fourth screw and tighten the re-
maining 3 screws to secure the structure in
place with con ulteriori (4) viti. Fig.6
8. Insert the bottom support frame into the
top support frame. Fig.7
Installa
tion - Moun
ting the Duc
t C
o
v
e
r
X
B
C
5 - 1/2"
24"
X = C - (5-1/2" + 24" + B)
- 4 -