background image

www.zephyronline.com

4. Remove the (2) screws to unlock the top support frame from the bottom support 

frame. Fig.4. 

5. Secure the top support frame to the duct 

cover ceiling bracket by using the (4) 
screws. Fig. 5

6. Position hole template on the ceiling paying 

attention that the arrow is positioned on 
the same side as the range hood controls.

- Make 4 holes in the ceiling and drive in (3) 

screws without completely tightening 
them. Pay attention not to insert the screw 
into the hole marked with an X  on the hole 
template. Fig.6

7. Lift the hood assembly to the ceiling and 

align the top support frame and ceiling bra-
cket with the (3) screws previously installed 
in the ceiling.

Rotate assembly slightly clockwise to lock in 

place. 

Drive in the fourth screw and tighten the re-

maining 3 screws to secure the structure in 
place with con ulteriori (4) viti. Fig.6

8. Insert the bottom support frame into the 

top support frame. Fig.7

Installa

tion - Moun

ting the Duc

t C

o

v

e

r

X

B

C

5 - 1/2"

24"

X = C - (5-1/2" + 24" + B)

- 4 - 

Reviews: