- 26 -
INSTALL THE HOOD
CAUTION: At least two installers are
recommended because of the large size
and weight of this range hood.
1. Re-install the grease
fi
lters and control
panel (Fig. 10/11).
2. Lift range hood into the ceiling opening.
3. Secure each support frame to the wooden
hood support frame using (6) 6 x 60 mm lag
bolts and washers provided. Fig. 32.
4. Adjust height of the telescoping support
frame to ensure a tight
fi
t between the hood
and
fi
nished ceiling.
5. Connect ductwork; Duct tape all joints to
ensure an air tight seal.
FIG.32
2x4 WOOD
FRAME
(6) WASHERS
& LAG BOLTS
WIRING (HOOD WITH INTERNAL BLOWER/S)
1. Remove a knockout from the wiring box marked120 Vac input (Fig.33).
2. Secure the conduit to the wiring box through a conduit connector.
3. Make electrical connections. Connect white to white, black to black and green to ground.
4. Fix wiring box cover and screws (Fig.33). Make sure that wires are not pinched between
cover and box.
FIG.33
BOX MARKED
“120 VAC
INPUT”
WIRING BOX
COVER
CONNECT:
WHITE-TO-WHITE,
BLACK,-TO-BLACK,
GREEN-TO-GROUND.
Summary of Contents for ALU-E63
Page 2: ...2...
Page 8: ...8 HOOD SPECIFICATIONS ALU E43...
Page 9: ...9 HOOD SPECIFICATIONS ALU E63...
Page 10: ...10 WIRING DIAGRAM ALU E43...
Page 11: ...11 WIRING DIAGRAM ALU E63...
Page 32: ...32...
Page 33: ...33...
Page 34: ...34...
Page 35: ...35 www zephyronline com HOTTE PER CUISINE Notice d utilisation ALU E43 ALU E63...
Page 41: ...41 SPECIFICATIONS TECHNIQUES ALU E43...
Page 42: ...42 ALU E63 SPECIFICATIONS TECHNIQUES...
Page 43: ...43 SCHEMA ELECTRIQUE ALU E43...
Page 44: ...44 SCHEMA ELECTRIQUE ALU E63...
Page 66: ...66...
Page 67: ...67...
Page 68: ...04308447 5...