background image

14

www.zephyronline.com

Installation – 

PBD-1

100A

 Dual Blower

7.  Secure dual blower plate to hood by following 

removal instructions in reverse. Attach blower 

wire to hood.

8.  Place 10” round adapter (included with PBD-

1100A)  on top of hood and secure with (4) 

M4x8 screws.  Connect 10” duct work.

 
 

The 10” round adapter is fi tted with a metal 

      damper to prevent outside airfl ow from 
 

entering the kitchen.  

 

The 6” round single blower is also fi tted with 

 

a metal damper.  If using the PBD-1100A dual 

 

blower kit, the metal damper from the 6” 

 

round single blower must be removed prior 

 

to instaling the 10”round adapter. See 

 

installation step 3 on page 13.

NOTE:  

To secure the 10” transition adapter to top of hood a cut out of 14 1/4” width x 10 1/4” depth will need 

to be made in the cabinet bottom.  

If internal cabinet dimensions prevent this size of a cut out then the 10” transition adapter may be mounted 

to the cabinet bottom rather than the top of the hood.  Cut out dimensions for this type of installation are 

13 1/4” width x 6 1/4” depth.

Summary of Contents for AK7000AS

Page 1: ...are and Installation Guide www zephyronline com Model number Serial Number Date of Purchase Sales Dealer SEP07 0101 Zephyr Corporation Tempest I AK7000AS AK7036AS AK7042AS READ AND SAVE THESE INSTRUCT...

Page 2: ...www zephyronline com...

Page 3: ...ptions 7 Speci cations 8 Mounting the Range Hood 9 10 Horizontal Conversion 11 12 PBD 1100A Dual Blower 13 14 ACCESSORY INSTALLATION Heat Lamp Kit 15 FEATURES CONTROLS Touch Controls Features 16 MAINT...

Page 4: ...PERSONS IN THE EVENT OF A RANGE TOP FIRE OBSERVE THE FOLLOWING a SMOTHER FLAMES with a close tting lid cookie sheet or metal tray then turn off the burner BE CAREFUL TO PREVENT BURNS If the ames do n...

Page 5: ...assure that the electrical installation is adequate and in conformance with National Electrical Code ANSI NFPA 70 latest edition or CSA standards C22 1 94 Canadian Electrical Code Part 1 and C22 2 No...

Page 6: ...rectangular transition for single blower horizontal ducting 1 6 round metal cap for single blower horizontal ducting 2 Blower brackets for single blower horizontal ducting 1 Hardware package HARDWARE...

Page 7: ...Ft 6 Round straight 1 Ft x Ft Subtotal column 1 Duct pieces T otal Equivalent number length x used 6 Round wall cap with damper 30 Ft x Ft Round wall cap with damper 30 Ft x Ft 7 10 Round 900 elbow 15...

Page 8: ...re required install as far away from hood duct output and as far apart between the two as possible Minimum mount height between range top to hood bottom should be no less than 26 Maximum mount height...

Page 9: ...ust must be ducted to the outside Use metal ductwork only Fasten all connections with sheet metal screws and tape all joints with certi ed Silver Tape or Duct Tape Some Ducting Options Installation Du...

Page 10: ...7 8 30 33 7 8 36 39 13 16 42 29 15 16 30 35 15 16 36 41 15 16 42 9 15 16 1 1 8 8 9 16 13 3 16 6 7 16 3 2 12 11 3 22 1 2 29 15 16 30 35 15 16 36 41 15 16 42 CL 5 7 8 5 9 16 elec k o top side back with...

Page 11: ...al codes and ordinances Electrical Supply This appliance requires a 120V 60Hz electrical supply and connected to an individual properly grounded branch circuit protected by a 15 or 20 ampere circuit b...

Page 12: ...ut the required openings for duct and electrical access make sure the duct opening is large enough to apply duct tape 6 Fasten hood onto cabinet with 4 M4 wood screws provided 7 Install electrical 8 I...

Page 13: ...G CONVERSION 1 Disconnect blower wire 2 Remove support screw from top of hood near the back Remove 2 screws holding blower plate to hood and pull blower towards front of hood to release from internal...

Page 14: ...ide 8 Picture of round to rectangular transition adapter installed in hood 9 Attach blower brackets to blower using 2 10x3 16 screws on each bracket 10 Place blower inside round end of round to rectan...

Page 15: ...Discard single blower plate 4 Picture of PBD 1100A dual blower kit 5 Use the blower removed from the single blower plate and install it into the dual blower plate DUAL BLOWER INSTALLATION IMPORTANT D...

Page 16: ...blower is also fitted with a metal damper If using the PBD 1100A dual blower kit the metal damper from the 6 round single blower must be removed prior to instaling the 10 round adapter See installati...

Page 17: ...ided 4 Install heat lamp wire cover over wire from heat lamp housing and screw shut Repeat for each heat lamp housing 5 Plug heat lamp wire from hood into wire from heat lamp housing 6 Install heat la...

Page 18: ...right hand side of display indicating the function is on The hood will change to speed 1 and shut down after 5 minutes Lights On Dim Off Manual On Off Switch lights On by pressing once again to dim an...

Page 19: ...ith grain Stainless Steel Baffle Filters The stainless steel baf e lters are intended to trap residue and grease from cooking Although the lters should never need replacing they are required to be cle...

Page 20: ...by turning bulb counter clockwise Note Bulb does not unscrew it turns 60 degrees stops and falls out If bulbs are dif cult to turn due to prolonged use rmly attach a glass suction cup approximately t...

Page 21: ...ot secure in place 1 Tighten the motor in place 2 Damaged blower wheel 2 Change the blower 3 The hood is not secured in place 3 Check the installation of the hood The motor is working but the lights a...

Page 22: ...0700AS Heat Lamp Kit 36 AK0706AS Heat Lamp Kit 42 AK0702AS Back Splash 30 AK0710 Back Splash 36 AK0716 Back Splash 42 AK0712 To order parts visit us online at http store zephyronline com or call us at...

Page 23: ...isuse abuse accident Improper installation and failure to follow installation instructions When product is used commercially or other than its intended purpose Damaged because of improper connection w...

Reviews: