10
www.zephyronline.com
Installation –
Installing the Hood
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
1) Prepare electrical wiring and ducting in cabinet. Location of junction box and blower outlet can be found on page 8.
2) Unscrew the (10) screws from front panel and place
the panel aside, Fig.3. You will now have access to the
interrior of the range hood.
Fig.3
Fig.4
3) Open cabinet doors. Lift range hood and slide it through
the opening located in the bottom of the cabinet, Fig.4.
Make sure opening matches the dimensions on page 9,
Fig.1.
4) There are spring clips located on the left and right sides
of the hood body which will temporarily hold the hood in
place, Fig.5.
Fig.5
Fig.6
5) Secure upper brackets to left and right sides of hood
body by using (2) 3/16 x 3/8” screws for each bracket.
Fig.6. Make sure the (2) captive nut screw holes on
the bracket are facing downward. Note: Due to limited
workspace in 30” cabinets you will need to use a right
angle or 2” long Philips head screwdriver.
1
2
Summary of Contents for Genova AK7336AS
Page 2: ...www zephyronline com...
Page 21: ...19 Maintenance Wiring Diagram 370W 270W 3 5A 3 5A...
Page 26: ...www zephyronline com...
Page 30: ...Liste du mat riel 4 www zephyronline com 2 M4 x 1...
Page 34: ...8 www zephyronline com Installation 6SpFL FDWLRQV GH OD KRWWH LC...
Page 40: ...14 www zephyronline com Commandes RPPDQGHV j HI HXUHPHQW...
Page 41: ...15 Commandes QGLFDWHXU GH FKDQJHPHQW GHV OWUHV j FKDUERQ...
Page 42: ...16 www zephyronline com COMMANDES QGLFDWHXU GH QHWWR DJH GHV OWUHV j WDPLV PpWDOOLTXHV...
Page 46: ...20 www zephyronline com 3 5A 3 5A Entretien Sch ma de c blage...