9
7
3/4
”
7”
9-
7/8”
19-
7/8”
C/L
1-
9/16”
Installation –
Preparing the Cabinet
Fig.1
front edge
glass handle
Fig.2
1. Determine and mark center line on wall and cabinet bottom with a pencil.
2. If the cabinet bottom is recessed, wood blocking must be installed to ensure proper
DOLJQPHQWRIWKHKRRGZLWKWKHFDELQHWERWWRP:RRGEORFNLQJVKRXOGEHÀXVK
within cabinet bottom.
3. Follow the dimensions in Fig.1 and cut-out the bottom of your cabinet to create an opening
IRUWKHKRRGWR¿WWKURXJK,I\RXKDYHDIUDPHOHVVFDELQHWEHJLQWKH´PHDVXUHPHQW
(
referenced in Fig.1
) from front of the cabinet door. This way the front edge of the hood will
EHÀXVKZLWKWKHFDELQHWGRRUVZKHQFORVHGVHH)LJ
Summary of Contents for Genova AK7336AS
Page 2: ...www zephyronline com...
Page 21: ...19 Maintenance Wiring Diagram 370W 270W 3 5A 3 5A...
Page 26: ...www zephyronline com...
Page 30: ...Liste du mat riel 4 www zephyronline com 2 M4 x 1...
Page 34: ...8 www zephyronline com Installation 6SpFL FDWLRQV GH OD KRWWH LC...
Page 40: ...14 www zephyronline com Commandes RPPDQGHV j HI HXUHPHQW...
Page 41: ...15 Commandes QGLFDWHXU GH FKDQJHPHQW GHV OWUHV j FKDUERQ...
Page 42: ...16 www zephyronline com COMMANDES QGLFDWHXU GH QHWWR DJH GHV OWUHV j WDPLV PpWDOOLTXHV...
Page 46: ...20 www zephyronline com 3 5A 3 5A Entretien Sch ma de c blage...