![ZEP SOLAR ZS Comp Installation Manual Download Page 42](http://html1.mh-extra.com/html/zep-solar/zs-comp/zs-comp_installation-manual_3425258042.webp)
© 2012/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0351-001 Rev B
Page 38
ZS COMP INSTALLATION MANUAL FOR COMPOSITION SHINGLE ROOFS - U.S.
Special Inset: Interlocks
Connect Array Skirt
Connect PV modules
Built-in tolerance for module size
variations
The Interlock creates a simultaneous structural and electrical bond on both Key and Tongue sides.
Interlock
Array Skirt
How Interlocks Are Used
Interlock Timing Marks
Gap OK
Down-roof
Part No. 850-1388
Leveling Foot
Alignment mark for Zep
Tool
Key side
Tongue side
Used to align module edges
around center point
Center point
Interlock
Zep
Farthest allowable position
of an off-center module
Placement Between Modules
Centered
Shifted right
Shifted left