© 2012/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0351-001 Rev B
Page 33
ZS COMP INSTALLATION MANUAL FOR COMPOSITION SHINGLE ROOFS - U.S.
First Module Row, Continued
Adjust Module on Tongues
Visually check the first row of modules. Ideally, Rockit of Leveling Foot should be flush
with module edge. Remove and re-seat if needed.
When module is fully seated, tongue
side of Interlock is fully concealed
inside module frame.
Fully Seated
(Optimal)
Acceptable
Top view
Top view
Side view
Module
Array Skirt
Interlock
5b
CAUTION:
When removing a module from a Leveling Foot, first pull the module out of
seat and then lift module upwards. See
i
ii
Rockit
Side view