background image

4

 

English

Subject

to

modifications

and

errors

excepted.

Any

liability

for

misprints

excluded.

 

Dismantleexistingmetersoradjustingpiece.

 

Useonlynewandflawlesssealingmaterial.

 

Checkthesealingsurfacefordamage.

 

Pay attention to correct flow direction while in

-

stalling. Ensure that during the installation pro

-

cessthegasketsdonotslip,donotfallout,or

are damaged.

 

Installationposition:

 

RNK-RP-N/RNK-L-RP-N:anyinstallationposition

possible

 

RTKD:any installation position possible except

overhead

 

RTKDE:anyinstallationpositionpossibleexcept

overhead

 

– RTKD 

L:anyinstallationpositionpossibleexcept

overhead

 

– RTKDE 

L:any installation position possible except

overhead

 

Screw the connection nuts and tighten them.

 

Openvalescarefullytoavoidpressureshocks.

 

Check installation point for leak tightness. The

roller dial and conformity /metrology indication

marks have to be visible and readable at any

time.

Additional instructions for installation of plas-

tic meter:  

 

 In order to guarantee a stress-free installation, 
we recommend the use of a water meter installa-

tionbracket(WZAG).

 

 Recommended tightening torque for the connec-

tors:min.20Nmuptomax.30Nm.

Declaration of conformity

ZENNER International GmbH & Co. KG declares

thattheproductswithfollowingnumberoftheEC

type-examinationcertificateDE-10-MI001-PTB001

aswellasDE-11-MI001-PTB016complieswiththe

essentialrequirementsoftheECdirective2014/32/

EU (Measuring instruments directive).

ZENNERInternationalGmbH&Co.KGherebyde

-

clares that the product for Remote Metering with

theapplicationWirelessCommunicationscomplies

withtheessentialrequirementsoftheECdirective

1999/5/CE(R&TTE).

The declaration of conformity and the latest in

-

formation about this product can be accessed or

downloaded from 

www.zenner.com

General notes

 

Watermetersareprecisioninstruments.Protect

against  shock and vibration. Store frost-free.

 

The sealing surfaces are equipped with thread

protectioncapsandthusprotectedfromdamage.

 

Checkbeforebeginningtheinstallation:

 

sealingsurfaceshavetobeflatandfreefrom

damage such as notches, grooves, etc..

 

–  all of indication marks on the roller dial have to 

be readable.*

 

meterhastofitintype,size,temperatureand

pres-sure rating to the installation and mete

-

ringpoint.

 

Pleasepayattentiontotheinformationoninstal

-

lationpositiononthedial.

 

By polluted or loaded water we recommend to

installfiltersorstrainersintheinletupstreamof

the meter.

 

Themetershouldalwaysbeinstalledatthelo

-

westpossiblepointofthepipingaswellasfrost

protectedtopreventtheaccumulationofairand

damages.

 

Thewatermeterhastobeinstalledintothepipe

-

line being free of any of mechanical forces or

tensions.

 

Duringtheoperatingprocesswatermeterhasto

becompletelyfilledwithwater.

 

Themeterhastobeprotectedwithappropriate

measuresagainstpressureshocksinthepipe

-

line.

 

By risk of frost, empty completely and shut off

the installation (including the meter), if necessa-

ry,dismountthemeter.

 

The meter has always to be easily accessible

and legible, including all indications on the mar-
king ring or dial.

 

Werecommendtoensureinstallationpointson

thepipelinewithasealagainstunauthorizeddis

-

mounting. The seal should not be removable or 
loosened without visible damage. 

 

Theinstallationhastobecarryoutbyqualified

personnel.

Installation:

 

Readthisinstructioncarefullyrightuptotheend!

 

Closestopvalvesupstreamanddownstreamthe

meter.

 

Dischargepressureattheinstallationpoint.

Data regarding the flow rates are depending on the respective nominal size.

ZENNER International GmbH & Co. KG

Römerstadt 6
D - 66121 Saarbrücken

Telephone  +49 681 99 676-30
Telefax 

+49 681 99 676-3100

E-Mail 

[email protected]

Internet 

www.zenner.com

Summary of Contents for RTKD

Page 1: ...ngkolbenz hler Installation manual 4 Volumetric rotary piston Manuel d installation 5 Compteur piston rotatif Istruzioni d installazione e d uso 7 Manual de montaje 6 Contador de agua volum trico con...

Page 2: ...zum Schluss durchlesen Absperrorgane vor und hinter dem Z hler schlie en Einbaustelle druckentlasten Vorhandenen Z hler oder Passst ck ausbauen Nur neues und einwandfreies Dichtmaterial ver wenden Dic...

Page 3: ...zenner com General notes Water meters are precision instruments Protect against shock and vibration Store frost free The sealing surfaces are equipped with thread protection caps and thus protected f...

Page 4: ...produ it sont disponibles sur notre site www compteurs zenner fr Indications g n rales Les compteurs d eau sont des instruments de pr cision A prot ger des chocs et des vibrations A conserver l abri d...

Page 5: ...l punto de montaje Datos de caudal en funci n del tama o nominal corre spondiente Desmonte los contadores o piezas de ajuste que haya Utilice solo material sellante nuevo y en buen es tado Controle si...

Page 6: ...ificato Per il resto si fa riferimen to alle prescrizioni previste dalla norma DIN ISO 4064 2014 parte 5 Installazione Leggere attentamente e fino in fondo il manuale di installazione Chiudere le valv...

Page 7: ...Az ellen rz plomba ne legyen szrev tlen l k n nyen felismerhet nyomok n lk l elt vol that vagy megbonthat A be p t st csak j l k pzett professzion lis szerel v gezheti Hivatkozunk a DIN ISO 4064 2015...

Page 8: ...mer und Druckfehler bernehmen wir keine Haftung SAP126002_ZRI_171124_DE_EN_FR_ES_IT_HU ZENNER International GmbH Co KG R merstadt 6 D 66121 Saarbr cken Telefon 49 681 99 676 30 Telefax 49 681 99 676 3...

Reviews: