5-4
DECK MECHANISM DISASSEMBLY
5. Frame Assembly Up/Down (Fig. 5-4)
Put the Base Main face down(Bottom Side)
1) Release the Screw(S4)
2) Unlock the Locking Tab(L3) in direction of arrow and
then lift up the Frame Assembly Up/Down to separate
it from the Base Main.
• When reassembling move the Guide Up/Down in direction
of arrow(C) until it is positioned as Fig.(C).
• When reassembling insert (A) portion of the Frame
Assembly Up/Down in the (B) portion of the Guide
Up/Down as Fig.(B)
6. Belt Loading(Fig. 5-4)
Put the Base Main on original position(Top Side)
7. Gear pulley (Fig. 5-4)
1) Unlock the Locking Tab(L4) in direction of arrow(B) and
then separate the Gear Pulley from the Base Main.
8. Gear Loading (Fig. 5-4)
9. Guide Up/Down (Fig. 5-4)
1) Move the Guide Up/Down in direction of arrow(A) as
Fig.(A)
2) Push the Locking Tab(L5) down and then lift up the
Guide Up/Down to separate it from the Base Main.
When reassembling place the Guide Up/Down as Fig.(C)
and move it in direction arrow(B) until it is locked by the
Locking Tab(L5). And confirm the Guide Up/Down as Fig.(A)
10. PWB Assembly Loading (Fig. 5-4)
Put the Base Main face down(Bottom Side)
1) Release 2 Screws(S5)
2) Unlock the Loading Motor (C2) from the Hook (H1) on
the Base Main.
3) Unlock 2 Locking Tabs(L6) and separate the PWB
Assembly Loading from the Base Main.
11. Base Main(Fig. 5-4)
Note
Note
Note
Note
Note
Fig. 5-4
Summary of Contents for XBV 443
Page 1: ......
Page 36: ...3 34 3 35 2 POWER SMPS CIRCUIT DIAGRAM 2 SR14301A DVW 7000 DVW 7000 Without...
Page 37: ...3 36 3 37 3 TU IF CIRCUIT DIAGRAM SR14305A DVW 7000 PB REC...
Page 40: ...3 42 3 43 6 JACK CIRCUIT DIAGRAM DVW 7000 Without DVW 7000 Without SR14306A DVW 7000...
Page 44: ...PRINTED CIRCUIT DIAGRAMS 1 MAIN P C BOARD LOCATION GUIDE 3 50 3 51...
Page 45: ...3 52 3 53 2 MAIN P C BOARD LOCATION GUIDE...
Page 62: ......
Page 68: ......
Page 100: ......
Page 106: ......
Page 108: ......