MECHANISM TROUBLESHOOTING GUIDE
4-26
No cassette insert is done.
Does the lever assembly
switch operate?
Is the lever assembly switch
spring normal?
Does the CST IN switch
operate normally?
Add or replace the lever
assembly switches spring.
Is the Vcc of the main P.C.B
assembly?
YES
YES
Check the Syscon circuit.
YES
Check the power circuit.
NO
Is voltage between the cassette
switch terminal and the GND on
the main P.C.B assembly?
YES
Is there short between the cassette switch terminal
and the GND on the main P.C.B assembly?
Replace the main P.C.B assem-
bly or remove the short part.
NO
Check the mode switch position
and the Syscon circuit.
Replace the CST IN switch.
YES
NO
YES
NO
NO
Replace the F/L switch.
NO
NO
No cassette eject is done.
Does the L/D motor turn in reverse?
Check the L/D motor and the drive IC.
Replace the lever assembly switch.
Does the lever assembly switch operate?
YES
NO
NO
Does the arm assembly F/G operate?
YES
NO
Does the opener door operate?
YES
Replace the arm assembly F/L
Replace the opener door.
2. Front Loading Mechanism
A.
B.
Summary of Contents for XBV 443
Page 1: ......
Page 36: ...3 34 3 35 2 POWER SMPS CIRCUIT DIAGRAM 2 SR14301A DVW 7000 DVW 7000 Without...
Page 37: ...3 36 3 37 3 TU IF CIRCUIT DIAGRAM SR14305A DVW 7000 PB REC...
Page 40: ...3 42 3 43 6 JACK CIRCUIT DIAGRAM DVW 7000 Without DVW 7000 Without SR14306A DVW 7000...
Page 44: ...PRINTED CIRCUIT DIAGRAMS 1 MAIN P C BOARD LOCATION GUIDE 3 50 3 51...
Page 45: ...3 52 3 53 2 MAIN P C BOARD LOCATION GUIDE...
Page 62: ......
Page 68: ......
Page 100: ......
Page 106: ......
Page 108: ......