background image

SuperBase Pro 2000

User Manual

Summary of Contents for SuperBase Pro 2000

Page 1: ...SuperBase Pro 2000 User Manual...

Page 2: ...esponsible for being aware of all relevant regulations and using Zendure products in a way that is compliant Keep this manual for future reference Speci cations Safety Guidelines Getting Started 3 1 I...

Page 3: ...rted Supported Pure Sine Wave rated 2 000W surge 4 000W 100 120V 50 60Hz US JP version or 220 240V 50 60Hz Other versions USB C1 2 5 20V 100W Max Each USB C3 4 5 12V 20W Max Total 13 6V 10A 136W Max 1...

Page 4: ...eavily vibrated Securely fasten the product when transporting to avoid damage If severely damaged turn off the power source immediately and discontinue using the product 9 If you accidentally drop the...

Page 5: ...d due to product failure contact a professional battery recycling company for further processing 3 When disposing of secondary cells or batteries keep cells or batteries of different electrochemical s...

Page 6: ...echarging Time AC Frequency Power Ring AmpUp Mode PVMax GridFlow Cell Network Current Input Current Output AC On 3 2 Display Power Button Display ON OFF Power Ring Indicator The ring lls up as the bat...

Page 7: ...rn off after 1 minute of idle operation You can change this through the Zendure App When the product senses any load change or other changes to its operations the Display will automatically light up T...

Page 8: ...oad for 1 hour the AC Power will automatically turn o Please turn o AC Output power when not in use to reduce energy consumption DC Output Port With the device powered on brie y press the DC Power But...

Page 9: ...ces of product misuse including but not limited to charging with an unsuitable wall outlet circuit or power cable Zendure s GridFlow fast charge technology is speci cally for AC recharging offering 1...

Page 10: ...0W Solar Panels sold separately to charge the product please follow the instructions that come with the solar panels Before connecting a solar panel please ensure that the solar panel s output voltage...

Page 11: ...he cell network connection press and hold the DC Power Button for 3 seconds This will also activate GPS services You can manually turn off the cell network or GPS services in the Zendure App The signa...

Page 12: ...all sounds You can turn on Sleep Mode in the Zendure App Any changes to input power setting light sound or standby time of the display will deactivate Sleep Mode 3 11 Of ine UPS This product supports...

Page 13: ...the product Please gently wipe it with a dry soft clean cloth or paper towel 6 How should I store the product Before storing please turn off the product then store it in a dry ventilated place at room...

Page 14: ...arge for a long period shortens its lifespan SuperBase Pro mitigates the damage by putting the battery into hibernation mode To get the most out of the battery make sure it is about 60 charged before...

Reviews: