Follow Pyrorack Commissioning steps
!
!
from the installation manual.
!
•
Populate the Micro Data Centre with your
!
!
critical equipment.
!
!
NOTE: Ensure adequate gaps are left between
!
the equipment housed within the Micro
!
Data Centre to ensure an effective air-flow is
!
maintained. The cooling system will maintain
!
the optimal cooling air-flow between the
!
equipment if this recommendation is adhered to.
!
NOTE: DO NOT exceed the cooling system
ʼ
s
!
recommended BTU/h specifications (listed
!
in the cooling system section) as this will
!
overheat the equipment.
!
The Zellabox Micro Data Centre is a
PLUG N
!
PLAY
unit therefore once it has been installed
!
by a qualified contractor the Micro Data
!
Centre is ready for use!
!
!
Follow these steps to start up your unit:
!
•
Start-up the switchboard
!
•
Switch Mains Isolator switch to the
ON
!
!
position
!
•
Switch Cooling System switch to the
ON
!
!
position
!
•
Switch UPS switch to the ON position
!
•
Switch all remaining switches to the
ON
!
!
position
!
Zellabox
!
Start-up
procedure
!
3
Start-up
procedure
!