4.5

 

Cooling

 

System

!

!

The

 

cooling

 

system

 

in

 

the

 

Micro

 

Data

 

Centre

 

is

 

designed

 

to

 

work

!

continuously

 

at

 

an

 

efficient

 

rate

 

enough

 

to

 

ensure

 

equipment

 

is

!

kept

 

at

 

the

 

desired

 

temperature.

 

The

 

38U

 

and

 

the

 

25U

 

Micro

 

Data

!

Centres

 

have

 

the

 

same

 

cooling

 

system

 

however

 

the

 

one

 

is

 

!

smaller in

 

capacity

 

than

 

the

 

other.

!

   

4.5.1

 

Operation

!

The

 

cooling

 

system

 

has

 

a

 

controller

 

which

 

is

 

located

 

at

 

the

 

back

 

of

 

the

!

box.

 

The

 

controller

 

allows

 

the

 

user

 

to

 

control

 

the

 

temperature

 

within

 

the

!

Micro

 

Data

 

Centre.

!

ALL

 

Micro

 

Data

 

Centre

ʼ

s

 

cooling

 

systems

 

are

 

preset

 

in

 

the

 

factory

 

to

 

run

!

efficiently

 

and

 

effectively

 

on

 

one

 

setting.

 

Zellabox

 

DOES

 

NOT

 

recommend

!

tampering

 

with

 

the

 

cooling

 

system

 

controller

 

but

 

rather

 

switching

 

the

!

cooling

 

system

 

off

 

at

 

the

 

switchboard

 

to

 

reset

 

the

 

controls.

!

The

 

recommended

 

temperature

 

setting

 

is

 

between

 

20

 

and

 

23

 

degrees

 

for

!

maximum

 

efficiency.

!

Problem

!

Potential Cause

!

Solution

!

Green

 

light

 

on front

 

panel

 

IS

 

NOT

 

illuminated

 

!

The

 

main

 

isolator 

 

switch

 

is

 

not

 

in

 

the

 

ON position

!

Turn

 

switch

 

on

!

!

There

 

is

 

no

 

power

 

to

 

!

the

 

switchboard

 

!

Ensure

 

there

 

is

 

no

 

problem with

 

the

 

main

 

supply

 

from building

!

Cooling

 

system

!

The

 

switch

 

on

 

the

 

front

 

panel

 

is

 

not

 

in

 

the

 

ON position

!

Turn

 

switch

 

on

!

!

Cooling is not 
plugged into

 

the

 

back

 

panel

 

of

 

the

 

switchboard

!

Plug the cooling 
system into

 

the

 

15AMP

 

socket

!

Problem

!

Cooling capacity 
(BTUh)

!

Cooling capacity 
(Watts)

!

Micro

 

Data

 

Centre

!

8900

 

!

2600

!

!

Micro

 

Data

 

Centre

!

11900

 

!

3500

!

!

Micro

 

Data

 

Centre

!

 

8900

 

!

2600

!

!

Micro

 

Data

 

Centre

!

 

11900

 

!

3500

!

!

Micro

 

Data

 

Centre

!

!

15695

!

4600

!

The

 

Cubb

 

Micro

 

Data

 

Centre

 

contains

 

only

 

1

 

cooling

 

unit

 

as

!

opposed

 

to

 

the

 

CubbDuo

 

Micro

 

Data

 

Centre

 

which

 

contains

 

2

 

units

!

which

 

alternate

 

every

 

4

 

days.

!

!

The following table

 

depicts

 

the

 

cooling

 

capacity

 

of

 

each

 

cooling

 

system:

 

!

Summary of Contents for Cubb

Page 1: ...1 Zellabox User Manual...

Page 2: ...2 Pyrorack 2 3 Uninterruptible Power Supply 2 4 Switchboard 3 Start up procedure 4 Technical Data 4 1 Access Control 4 2 Pyrorack 4 3 Uninterruptible Power Supply 4 4 Switchboard 4 5 Cooling System 4...

Page 3: ...nd robust environment The Micro Data Centre eliminates the need for a server room Our micro data centres offer a robust and dependable answer to the question of housing and securing your networking an...

Page 4: ...ructions 2 1 Overview Important safety note Caution needs to be taken when removing the side panels of the Micro Data Centre in particular when dealing with the 38U as they are heavy we recommend a 2...

Page 5: ...ted Avoid exposure to the fire by products and extinguishing mixture Should it be necessary to enter the area before it is fully ventilated the use of a respirator or other means of protection may be...

Page 6: ...p on or trip over them Do not connect domestic appliances such as hair dryers to UPS output sockets The UPS can be operated by any individuals with no previous experience Connect the UPS system only t...

Page 7: ...e take the precautionary measures specified below and any other measures necessary when working with batteries Remove wristwatches rings and other metal objects Use only tools with insulated grips and...

Page 8: ...DO NOT exceed the cooling system s recommended BTU h specifications listed in the cooling system section as this will overheat the equipment The Zellabox Micro Data Centre is a PLUG N PLAY unit theref...

Page 9: ...nt panel indicators will be as follows Mode Indicator Door Indicator 9 Zellabox Technical data 4 Technical data 4 1 Access control 4 1 1 Metal Keypad Key Features 500 Users Water and vandal resistant...

Page 10: ...Water and vandal resistant Backlight Backlit family option B Three user levels normal secure master Three modes of operation normal bypass secure Integrated keypad for PIN entry Piezo electric Q44 on...

Page 11: ...irements The installation of this product should only be carried out by a competent person and comply with applicable current National or International standards 11 Zellabox Technical data 4 2 Pyrorac...

Page 12: ...base correctly also check that the end of line resistor is in place on the detector base 4 2 3 3 System Fault Cause see all other Fault Indications and Detectors Remedy Check Detectors in place and p...

Page 13: ...t every 3 months the following checks are carried out by a competent person Entries in the Log Book are checked and any necessary action taken Batteries and their connections should be examined and te...

Page 14: ...Zellabox Technical data 4 3 Uninterruptibale power supply 4 3 1 Introduction Please refer to relevant UPS User Manual provided in the Zellabox or alternatively go online 14...

Page 15: ...res Functions The switchboard is plugged or hardwired directly into the building s power source and has a green light on the front panel which MUST be illuminated at all times indicating there is a po...

Page 16: ...but rather switching the cooling system off at the switchboard to reset the controls The recommended temperature setting is between 20 and 23 degrees for maximum efficiency Problem Potential Cause So...

Page 17: ...ratures over 42 degrees within the data centre while a cooling unit is running the alternate unit will start up and provide extra cooling for the Micro Data Centre Once the temperature drops below 20...